







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Junior ADU Really Costs in Lewisville, TX (And What Your 1980s Ranch Adds to the Bill)
Most junior ADU quotes in Lewisville start around $45,000 and run to $130,000 for the JADU conversion itself. But if your ranch home was built before 1985, budget another $8,000-$18,000 for host-home remediation that rarely shows up in a first estimate: aging electrical panels, galvanized plumbing, and insulation that has to meet code before the city will issue a certificate of occupancy. Call (844) 560-4467 and we’ll walk your actual house, not a template, before we put a number in writing.
That gap is the whole story of JADU pricing in Lewisville. Square footage matters, but what’s hiding inside your existing walls usually decides the final bill.

Why JADU Cost in Lewisville Isn’t a Square-Footage Math Problem
A junior ADU (JADU) is a small, self-contained living unit built inside or attached to your existing home, capped at roughly 500 square feet and sharing a bathroom with the main house. Because it lives inside your footprint, the unit can’t be legal to occupy until the host home it hangs off meets current code. Lewisville inspectors look at the whole house when they sign off, not just the new bedroom and kitchenette.
Here’s where the real money hides. Old Town Lewisville and the older core near the lake are full of 1960s-1980s brick ranch homes on pier-and-beam foundations. Those homes were wired for a fraction of the load a modern JADU pulls: a small kitchen, a mini-split, a tankless water heater, and dedicated circuits. An aging panel often can’t carry that, and galvanized supply lines have usually reached the end of their life. Each of those is a cost line before a single finish goes in.
Then there’s the black gumbo clay under most of Lewisville. It heaves hard in drought-then-flood cycles, and pier-and-beam floors in the older core go out of level over decades. Before interior JADU finishes can begin, the subfloor has to be leveled and a moisture barrier installed. Contractors who skip that step are handing you a problem, not a plan.
If you want the full picture of how a JADU fits into a larger addition strategy, see our Home Additions & ADU page.
The Two-Part Cost Structure: Conversion vs. Host-Home Compliance
A trustworthy JADU bid separates these two numbers. Blurring them is how estimates balloon into change orders mid-project. Here’s what each part covers.
Part 1: The JADU Conversion Itself
- Framing, insulation, drywall, and finish for up to ~500 square feet
- A kitchenette with sink, cooktop, and refrigeration circuit
- Dedicated bathroom or shared-bath modifications
- A separate entrance with proper egress
- HVAC, lighting, and finish carpentry
Part 2: Host-Home Code Compliance (The Part Estimates Omit)
- Electrical service upgrade: panel replacement or subpanel work to carry the added load
- Plumbing: replacing galvanized supply lines, adding shutoffs, and confirming drain capacity
- Insulation and weatherization: bringing the host home envelope up to current energy code
- Egress: window sizes, door clearances, and a legal path out of the unit
- Foundation and subfloor work: leveling and moisture barrier on pier-and-beam homes
This is the $8,000-$18,000 range that depends entirely on your home’s age and condition.

Lewisville JADU Cost Ranges
These are market-calibrated ranges, not teaser prices. Every one comes with upfront pricing and no surprises.
| Line Item | Typical Cost Range |
|---|---|
| Junior ADU conversion (base) | $45,000-$130,000 |
| Host-home electrical & plumbing remediation | $8,000-$18,000 |
| Pier-and-beam subfloor leveling + moisture barrier | $3,500-$9,000 |
| Full ADU construction (standalone) | $90,000-$220,000 |
| Garage conversion | $30,000-$80,000 |
A 1970s brick ranch near Lewisville Lake and a 1990s tract home in the north end of the city are two different projects with two different baselines. The lake-adjacent and floodplain-adjacent corridors also bring Corps of Engineers lake permitting and FEMA AE elevation rules into play when a project touches site work. A home that’s already been updated barely touches the remediation range; a home that hasn’t will land near the top of it. That’s your two-speed Lewisville market at work.
What That Looks Like as a Monthly Payment
A lump sum is scary. A payment isn’t. Here’s how our 0% financing for 18 months and $1,000 off projects over $10,000 change the math.
- $45,000 JADU: after the $1,000 discount ($44,000 financed), roughly $2,444 per month for 18 months at 0%
- $60,000 total project: after the $1,000 discount ($59,000 financed), roughly $3,278 per month for 18 months at 0%
- $90,000 total project: after the $1,000 discount ($89,000 financed), roughly $4,944 per month for 18 months at 0%
These are planning estimates, not contract terms. Call (844) 560-4467 for an exact quote on your home.
Why a Groundwork Estimate Holds
Every project carries our 730-Day Done Right Promise. If it’s not done right, we make it right, for two full years past handoff. That’s the reason our JADU numbers survive contact with a real job site. When remediation uncovers something our initial walk didn’t see, we document it and fix it under the promise. It does not become a change-order ambush.
Our technicians have up to 12 years of experience, and they arrive background-checked and uniformed. We also use the same trades on your JADU that we use on our kitchen and bath work: Schluter shower systems, Toto fixtures, Grohe plumbing components, and Sterling bath hardware, so the finishes inside a JADU match the same quality bar as the rest of your home. Calls reach a live person 24/7.
For a look at how the same quality craft translates to a nearby market, see our service areas.
Key Takeaways
- JADU conversion in Lewisville: $45,000-$130,000
- Host-home remediation on pre-1985 homes: $8,000-$18,000
- Pier-and-beam leveling and moisture barrier: $3,500-$9,000
- 0% financing for 18 months and $1,000 off over $10,000 make it a monthly payment
- 730-Day Done Right Promise covers the work, not just the handshake
FAQs
A junior ADU in Lewisville typically runs $45,000-$130,000 for the conversion itself, plus $8,000-$18,000 in host-home remediation if your home was built before 1985. Call (844) 560-4467 for an exact quote; estimates are free.
Usually yes if your home was built before 1985. The city won’t issue a certificate of occupancy on a JADU that shares an overloaded panel with the main house. Call (844) 560-4467 and we’ll check your service capacity before you commit to anything.
A garage conversion runs $30,000-$80,000 and a JADU conversion runs $45,000-$130,000, so a garage conversion is usually the lower-cost path if you have a garage you can spare. The trade-off is losing parking and storage. Call (844) 560-4467 to see which fits your lot.
You’ll need building, electrical, plumbing, and mechanical permits, plus a certificate of occupancy before anyone can legally live in the unit. Lewisville inspectors evaluate the host home alongside the new unit. Call (844) 560-4467 and we’ll map the permit path for your address.
Ready to Put a Real Number on Your JADU?
Call (844) 560-4467 for a free project estimate and design consult. We’ll walk your Lewisville home, separate the conversion cost from the remediation cost, and put our 730-Day Done Right Promise behind every line. No voicemail, no surprises.
Written by the team at Groundwork Construction Co. of Lewisville, serving Lewisville, TX.
What Our Customers Say
"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."
- Craig Whitaker"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson












