A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Carrollton, TX

ADU Site Prep & Utilities in Carrollton - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Carrollton: What the Groundwork Actually Costs

Site prep and utilities for a detached ADU in Carrollton typically runs $45,000 – $130,000 for the excavation, slab, and full utility run-outs, and the portion most homeowners underestimate is the trenching, grading, and separate meter work, which together take 3 – 5 weeks before a single wall goes up. That’s the ground floor of the job. There’s no finished square footage to show for it, and it’s where schedules slip. Call (844) 560-4467 and we’ll walk your lot and give you a written line-item before you commit to anything.

Call (844) 560-4467

How We Run Site Prep and Utilities, Stage by Stage

A remodeled family room with new windows and a window seat

This is not a phase where you hand over a set of plans and disappear. You’ll make four decisions along the way, and here’s exactly when each one lands.

Stage 1: Utility Locate and Site Survey (Days 1 – 3)

Before a machine touches dirt, we call for the locate on every buried line and confirm where your existing water, sewer, gas, and electric actually run. On a Carrollton lot, that means understanding how the ADU pad relates to your main house lateral. You decide nothing here except access: where the crew stages equipment and whether a fence panel comes down temporarily for a track hoe. We map the trench routes and flag conflicts with tree roots, existing irrigation, and any old concrete we’ll need to demo.

Stage 2: Clearing, Grading, and Drainage (Days 4 – 10)

We strip the topsoil, cut the pad to grade, and build the drainage that keeps North Texas clay from heaving your slab. This is where you decide whether the ADU sits on a raised pad or a cut-in grade, and that choice affects how water sheds across the whole lot. On flatter Carrollton lots we often add a swale or a french drain, and that decision gets made now because retrofitting drainage after the slab is poured costs three times as much.

Stage 3: Utility Trenching and Rough-In (Days 11 – 20)

Water, sewer, gas, and electric all get trenched and run to the future ADU footprint. You choose whether the ADU gets its own meter or ties into the main service, and that’s a real cost decision. A separate electric meter adds roughly $2,000 – $5,000 in service work but keeps the ADU’s usage clean for a future renter or family member. Sewer depth matters too, and it’s driven by where your existing line sits relative to the new pad.

Stage 4: Slab Prep and Pour (Days 21 – 30)

We form the footings, set the vapor barrier and rebar, and pour the slab to the engineer’s spec. On expansive clay, the reinforcement and the moisture barrier aren’t optional extras; they’re what keeps the slab from cracking over a decade of wet-dry cycles. You’ll sign off on the pour date, and we schedule it early in the morning to beat the summer heat.

Stage 5: Inspections and Utility Tie-Ins (Days 31 – 40)

The city inspects the underground work before it’s covered, then we bring utilities to the stub-outs and backfill. You’ll want the inspection sign-off in hand, because the ADU build can’t start until underground is signed off. By the end of this stage you have a graded, drained, fully serviced pad ready for framing, which is where the rest of the Home Additions & ADU in Carrollton scope picks up.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Change the Number

Site prep looks like one line item on a bid, but it’s really five decisions stacked together. Here’s what you’re choosing between and what each one does to the bottom line.

  • Separate vs. shared utility meters. A separate electric and water meter costs $3,000 – $8,000 more upfront but makes the ADU independently billable. Shared service is cheaper on day one and messier if a tenant or relative ever lives there.
  • Grading approach: raised pad vs. cut-in grade. A raised pad handles clay-soil drainage better and costs a bit more in fill. Cut-in grade saves on fill but puts more demand on the drainage system you build around it.
  • Drainage: swale, french drain, or both. A simple swale is the low-cost option. A french drain with gravel and perforated pipe handles the heavier North Texas rain events better and adds $2,500 – $6,000 depending on run length.
  • Driveway and access surface. If your only access is a side yard, you may need a temporary haul road or a permanent surface. Homeowners often pair this with Concrete Driveways & Concrete Work in Carrollton or a Paver Driveways in Carrollton build so the ADU entry matches the house.
  • Slab reinforcement grade. Standard rebar grid vs. a heavier engineered spec for expansive clay. The upgrade adds cost but is the difference between a slab that holds and one that cracks.

What ADU Site Prep & Utilities Costs in Carrollton, TX

A framer checking new wall framing on a home addition

For a detached ADU, expect $45,000 – $130,000 for the full site prep and utilities package, and the spread is wide because the variables below swing hard. Here’s a rough breakdown of what drives each band.

Work Item Typical Range
Clearing, grading, and drainage $6,000 – $20,000
Utility trenching and rough-in $12,000 – $35,000
Separate meter and service connections $3,000 – $8,000
Slab, footings, and reinforcement $15,000 – $40,000
Driveway/access and finish grading $5,000 – $15,000

What moves you to the high end: a large lot with long trench runs, rocky or heavily compacted soil that slows excavation, multiple utility relocations, and a separate utility meter. What keeps you near the low end: a flat, clear lot, short runs to existing services, and shared service connections. Every estimate we write is line-item, so you see each one of those numbers before work starts. Pricing doesn’t move once it’s in writing.

What’s included in a written estimate: locates, excavation, grading, drainage, trenching, slab, reinforcement, inspections, and finish grading. What’s typically not included: the ADU structure itself, interior finishes, landscaping replanting, and any foundation repair to the main house that turns up during excavation.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Carrollton Lots Specifically Do to This Job

Carrollton’s clay soil is the single biggest factor in how this job goes. The expansive “black gumbo” swells when it’s wet and shrinks when it’s dry, and that wet-dry cycle is brutal on slab-on-grade foundations. We design the slab and drainage around that reality, not around a generic spec. On the older brick ranch lots off Belt Line Road and Josey Lane, in ZIPs like 75006 and 75007, we frequently find undersized fascia and soffit venting from the 1970s and 80s build era, which tells us the drainage and grading we install needs to handle more runoff than the original lot ever planned for. On the newer 1990s – 2000s subdivisions in 75010, the lots are larger but often flatter, so water pools instead of running off, and we add a swale to compensate. Because Carrollton’s Economic Development department actively pushes redevelopment along Belt Line and downtown, infill projects sometimes face slower permit review than straight residential remodels, and we plan the schedule accordingly. That local read is part of how we scope Home Additions & ADU work across Carrollton.

Serving Carrollton, TX – Our Local Coverage Area

We serve Carrollton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Carrollton

New painted shaker cabinets with an organized deep drawer

Ready to Scope Your ADU Site Work?

If you’re planning a detached ADU in Carrollton, the ground work is where the budget lives, and it pays to know your number before design is final. Call (844) 560-4467 for a free on-site estimate. We’ll walk the lot, check your existing services, and hand you a written, line-item quote with no change orders once work starts. Live person answers, 24/7.

Written by the team at Groundwork Construction Co.

Why Carrollton Chooses Groundwork Construction Co. of Lewisville

We set the standard for ADU site prep & utilities in Carrollton.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Carrollton

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Carrollton Customers Say

Trusted by homeowners across Carrollton and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fence

More services in Carrollton

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Carrollton?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Carrollton.

(844) 560-4467

Request a Free Estimate in Carrollton

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch