A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Providence Village, TX

New Detached ADU in Providence Village - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Providence Village, TX: What It Costs and What to Expect

A new detached ADU in Providence Village, TX typically runs $45,000 to $130,000, depending on square footage, finishes, and how much plumbing and electrical has to travel from the main house to the new structure. Most projects here take 4 to 7 months from the first drawing to final inspection. Call (844) 560-4467 for a free on-site estimate before you commit to anything.

Call (844) 560-4467

How a New Detached ADU Gets Built Here, Stage by Stage

A finished backyard cottage with a small covered porch

This isn’t a weekend project, and anyone who tells you otherwise hasn’t built one. Here’s the actual sequence, with realistic durations for a Providence Village lot.

Stage 1: Design and the architectural review submittal (2 to 5 weeks)

Day one is a site walk: we measure setbacks, check where the sewer tap and electrical panel sit, and confirm the lot can legally hold a detached structure of the size you want. From there, drawings go to the Providence Village HOA’s architectural review committee before anything else happens. This is the step most homeowners underestimate, because a denial sends you back to the drafting table. You’ll pick the footprint, roof pitch, and exterior cladding at this stage, and those choices need to match the community palette.

Stage 2: Permitting and site prep (3 to 6 weeks)

Once the architectural review clears, the permit package goes to the town. Site prep follows: marking utilities, clearing the footprint, and grading for drainage so water moves away from both the ADU and the main house. You approve the final site plan here before dirt moves.

Stage 3: Foundation and framing (3 to 5 weeks)

A slab goes down on most Providence Village ADUs, though pier-and-beam shows up on lots with problem clay. Framing follows the approved plan, and the first rough inspection happens before the walls close up. The homeowner decision here is window placement and door swing, set early because moving them later means reframing.

Stage 4: Rough-ins and systems (2 to 4 weeks)

Plumbing, electrical, and HVAC rough-ins happen in sequence, each inspected before it’s covered. If the ADU has its own kitchen or bath, this is the longest stretch. You’ll choose fixtures now, and Kohler and Moen both fit cleanly into a modest budget without looking builder-grade.

Stage 5: Finishes and final inspection (3 to 5 weeks)

Insulation, drywall, paint, flooring, cabinets, and trim. Countertops go in near the end, and Caesarstone is a solid option if you want a stone surface that holds up in a rental or guest unit. The final inspection closes the permit, and we walk the finished unit with you before handing over keys.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Most of the decisions that shape both the cost and the finished ADU get made in the first three weeks. Here’s what actually matters.

  • Footprint and layout. A 500 sq ft studio costs less to build per square foot than a 900 sq ft one-bedroom because plumbing and kitchen runs stay short. Pick the smallest unit that does the job you need it to do.
  • Slab versus pier-and-beam. A slab is cheaper and simpler. Pier-and-beam handles Blackland Prairie clay movement better on problem lots but adds cost and complexity. We check soil conditions before recommending one.
  • Exterior cladding. Brick and stone veneer match the surrounding production homes and clear architectural review easily. James Hardie fiber cement is lighter on the budget and paints to the community palette. Either way, the color has to be approved.
  • Roofing. Composition shingle is the default and matches the main house across most of Providence Village. Metal lasts longer but rarely clears the architectural committee here without a fight, so check before you fall in love with it.
  • Kitchen and bath fixtures. A full kitchen pushes cost up fast. A kitchenette with a sink, mini-fridge, and microwave saves thousands and suits a guest unit or home office. Blanco sinks and Kohler faucets are dependable mid-range picks.
  • HVAC. A dedicated mini-split is efficient and easy to zone. Tying into the main house system is cheaper up front but can strain capacity if the main unit is already sized tight.

What a New Detached ADU Costs in Providence Village, TX

A framer checking new wall framing on a home addition

Expect a range of $45,000 to $130,000 for a detached ADU in Providence Village. A compact studio on a simple slab lands near the bottom. A full one-bedroom with a kitchen and its own HVAC, finished to match the main house, pushes toward the top.

Five variables drive the number:

  • Size. Every additional 100 sq ft adds cost, but the per-square-foot rate drops as the unit grows.
  • Distance from utilities. The farther the ADU sits from the main panel and sewer tap, the more trenching and wire you pay for.
  • Kitchen and bath scope. A full kitchen with stone counters costs far more than a kitchenette with laminate.
  • Material grade. Brick veneer and stone trim sit at the high end. Fiber cement and painted trim sit lower.
  • Permit and review scope. A straightforward slab on a flat lot is quick to review. Anything touching drainage, easements, or lot-line setbacks gets more scrutiny.

A written estimate from us breaks out the foundation, framing, systems, finishes, and permit fees line by line, so you can see exactly what you’re paying for. What it won’t include: furniture, landscaping, or appliances you source separately.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Providence Village Homes Specifically Do to This Job

Providence Village is a master-planned community built almost entirely after 2000 on former ranch land north of US 380, and that changes the work. Nearly every home is a production-built single-family on a slab, brick or stone veneer, composition shingle roof. There’s no historic renovation here. The real obstacles are the HOA architectural review rules and builder-grade subdivision standards.

Because so many homes came from the same handful of production builders, identical floor plans and identical failure points show up block after block. That means we already know how your lot drains, where the panel sits, and what the HOA will and won’t approve. The Blackland Prairie clay under every lot expands and contracts with North Texas wet-dry cycles, so slab design and grading against the foundation matter more than they would on sandy soil. Drainage from the new ADU has to move away from both structures, and the town cares about lot-line drainage in a way older Denton County towns like Sanger or Aubrey simply don’t. We handle the architectural review submittal and pull the permits so nothing gets built before it’s approved.

Serving Providence Village, TX – Our Local Coverage Area

We serve Providence Village and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: New Detached ADU in Providence Village

A new clay tile roof

Get a Free Estimate for Your Detached ADU in Providence Village

If you’re planning a new detached ADU in Providence Village, start with a free on-site estimate. Call (844) 560-4467 and a live person picks up, day or night. We’ll walk your lot, check setbacks and utilities, and talk through what your community’s architectural review will approve. You’ll get a written, line-item quote with upfront pricing, no surprises. Homeowners often pair this with Concrete Driveways & Concrete Work in Providence Village or Paver Driveways in Providence Village to finish the access path. This work is part of a full Home Additions & ADU in Providence Village scope, and you can see our broader Home Additions & ADU service for the full picture. We cover all of Providence Village and the surrounding area.

Written by the team at Groundwork Construction Co.

Why Providence Village Chooses Groundwork Construction Co. of Lewisville

We set the standard for new detached ADU in Providence Village.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Providence Village

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Providence Village Customers Say

Trusted by homeowners across Providence Village and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in Providence Village

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Providence Village?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Providence Village.

(844) 560-4467

Request a Free Estimate in Providence Village

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch