Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Carrollton: What It Takes and What It Costs
A garage conversion ADU in Carrollton usually runs $45,000 – $130,000 and takes 10 to 16 weeks from demolition to final inspection, depending on whether you’re adding a bathroom, a kitchenette, and a separate utility meter. The job turns an existing attached or detached garage into a legal, permitted living space: new slab or floor system, framed walls and ceiling, insulation, HVAC, electrical, plumbing, fire separation from the main house, and a certificate of occupancy at the end. Call (844) 560-4467 to schedule a free on-site estimate and a written line-item scope.
How a Garage Conversion ADU Comes Together, Stage by Stage

Garage conversions are mostly an interior build inside an existing shell, which is why the sequence matters more than the square footage. Here’s the real order of work.
Stage 1: Feasibility and permit set (week 1 – 3)
We measure the garage, check the slab, and confirm ceiling height and setbacks against what Carrollton will approve. You decide the layout here: studio versus one-bedroom, bathroom position, and whether the kitchenette shares a wall with the main house plumbing. A draftsperson turns that into a permit set. This is the stage where a bad assumption costs the most money, so it’s also where we spend the most time.
Stage 2: Demolition and slab prep (week 3 – 4)
Out goes the overhead door, the opener, and any shelving. The existing slab usually sits 4 to 8 inches below the house floor, so we build up a subfloor to bring the ADU level with the main living area, or pour a topping slab with a moisture barrier. Garage slabs were never finished for living space, and North Texas clay movement shows up here as cracks and low spots we correct before framing.
Stage 3: Framing, mechanicals, and fire separation (week 4 – 8)
We frame the new walls, close the old garage opening with a proper wall and window or door, and run electrical, plumbing, and HVAC. The wall between the ADU and the house gets a fire-rated assembly, which is a code requirement, not a preference. Rough-in inspections happen before any drywall goes up. You’ll pick fixture locations and outlet counts at this stage.
Stage 4: Insulation, drywall, and finishes (week 8 – 13)
Spray foam or batt insulation goes in, then drywall, then the finish trades: flooring, tile, cabinets, paint, trim, and the bathroom and kitchenette build-out. This is the longest stretch and the one where your material choices have the biggest effect on the final number. Kohler and Moen fixtures are common picks for ADU bathrooms because replacement parts are easy to source down the road.
Stage 5: Final inspections and certificate of occupancy (week 13 – 16)
Electrical, plumbing, mechanical, and building inspections all happen before you can legally occupy the space. We schedule them and handle corrections. The certificate of occupancy is the document that makes the ADU real for rental, resale, and insurance purposes, and we don’t consider the job done without it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between for a Garage Conversion ADU
Most of the decisions that move your price are made in the first three weeks. These are the ones that come up on nearly every Carrollton conversion.
- Slab buildup versus a raised subfloor: A raised wood subfloor gives warmer floors and room for plumbing runs, at a higher material cost. A topping slab keeps the space feeling taller and is cheaper, but plumbing gets more complicated and the floor stays cold in winter.
- Full kitchen versus kitchenette: A full kitchen with a range and vent hood needs more electrical and often a dedicated gas line. A kitchenette with a sink, mini-fridge, and microwave saves significant money and is fine for most rental or family uses.
- Tank water heater versus tankless: Tankless frees up closet space and runs efficiently for one bathroom. Tank units cost less upfront and are simpler to service. Either way, the unit needs proper venting.
- Mini-split versus extending the house HVAC: A dedicated mini-split gives the ADU its own thermostat and avoids overloading the main system. Tying into the existing system is cheaper but compromises temperature control for both spaces.
- Separate utility meter versus shared: A separate electric meter makes the ADU easy to rent and bill fairly. It adds cost and a utility coordination step, so decide early.
- Flooring: Luxury vinyl plank handles moisture and slab movement well and is the value pick. Tile in the bathroom and entry is standard. Engineered hardwood looks best but doesn’t love the temperature swings a converted garage sees.
What a Garage Conversion ADU Costs in Carrollton, TX

Plan on $45,000 – $130,000 for a permitted garage conversion ADU in Carrollton. The low end fits a studio with a bathroom and kitchenette inside an attached garage that’s already in good shape. The high end covers a larger detached garage with a full kitchen, separate meter, and structural repairs to the slab or framing.
Four things push the number up or down:
- Size and configuration: A one-car garage conversion lands near the bottom of the range; a two- or three-car detached garage adds square footage, more windows, and often a second bathroom.
- Existing condition: A cracked or settled slab, rotted fascia, or an undersized electrical panel adds real money. Older garages in Carrollton’s first-ring neighborhoods frequently need all three.
- Moving plumbing and structure: Keeping the bathroom against an existing house wall is far cheaper than running new drain lines across the slab to the far corner.
- Finish grade: Basic LVP, stock cabinets, and builder fixtures sit at the low end. Caesarstone counters, custom cabinetry, and a full appliance package push toward the top.
- Permit scope: A full ADU permit with a separate address is a bigger process than a simple interior remodel, and it’s the only route to a legal rental unit.
A written estimate from us lists every line: demolition, framing, mechanicals, insulation, drywall, finishes, fixtures, permits, and inspections. It does not typically include structural repairs discovered after demo, utility connection fees charged by the city, or landscaping to replace the driveway apron. We flag those possibilities before work starts so there are no surprise change orders. If the conversion is part of a full Home Additions & ADU in Carrollton plan, we scope the two together.
See the difference
Before
After
Before
After
Before
AfterWhat Carrollton Homes Specifically Do to This Job
Carrollton’s building stock splits the conversion work into two different jobs. In the older brick ranch homes around 75006 and 75007, off Belt Line Road and Josey Lane, garages were built before modern energy codes with undersized fascia and soffit venting. We routinely find attic heat and soffit rot that a 75010 build from the 1990s or 2000s never had, and the fix belongs in the budget. Those older slabs have also had decades to move on North Texas black gumbo clay, so we check for settling before framing. The newer two-story subdivisions in 75010 usually start from a sounder shell but come with HOA review and tighter side setbacks. The city’s push to redevelop downtown Carrollton and the Belt Line corridors means permit review on infill lots can move slower than a straight residential remodel in the same ZIP. We cover the full city, and you can see the wider footprint on our Carrollton service-area page.
Serving Carrollton, TX – Our Local Coverage Area
We serve Carrollton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Carrollton

A garage conversion ADU in Carrollton typically takes 10 to 16 weeks from demolition to certificate of occupancy, with permitting adding another 3 to 6 weeks on the front end. The build itself is faster than a ground-up addition because the shell already exists, but inspections and finish work set the pace. Call (844) 560-4467 for a schedule based on your specific garage.
Yes. A habitable garage conversion ADU requires a building permit and inspections in Carrollton, and you need the certificate of occupancy to legally rent or sell the space as living area. We pull the permits and manage every inspection. Converting without one creates a real problem at resale and with insurance, so this isn’t a step worth skipping.
Often, yes. If the bathroom and kitchenette share a wall with the main house plumbing, we can usually avoid major drain relocation entirely. The one thing that always changes is the garage door opening, which gets framed in as a wall with a window or door. We confirm what’s feasible during the feasibility walkthrough before any permit is filed.
Most garage conversion ADUs in Carrollton fall between $45,000 and $130,000, depending on size, existing condition, plumbing runs, finish grade, and permit scope. A studio with a bathroom and kitchenette in an attached garage sits near the bottom; a detached two-car garage with a full kitchen and separate meter sits near the top. Call (844) 560-4467 for an exact quote, and estimates are free.
Every garage conversion ADU we build is covered by the 730-Day Done Right Promise. If something isn’t done right, we make it right for two full years after completion, which is one of the longest workmanship guarantees in residential construction. Our technicians bring up to 12 years of experience, and the warranty is in writing rather than implied.
Get a Free Estimate for Your Garage Conversion ADU in Carrollton
We start with a free on-site estimate: we walk the garage, check the slab and mechanicals, talk through layout and finish options, and leave you with a written line-item quote in plain numbers. No pressure, no vague ranges. If you’re also rethinking the drive, homeowners often pair the conversion with Concrete Driveways & Concrete Work in Carrollton or Asphalt Driveways & Resurfacing in Carrollton to open up parking. Call (844) 560-4467 to schedule, or start with our Home Additions & ADU service for the bigger picture.
Written by the team at Groundwork Construction Co.