Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Before you commit to anything, answer two questions.
The first is whether the garage triggers a Texas Residential Code threshold when you convert it to living space. It usually does. A garage conversion in Addison means pulling a building permit and meeting egress, insulation and height rules the raw garage doesn’t meet. The second is whether the slab and existing walls are worth building on. Most are, which is why a garage conversion in Addison runs $45,000 – $130,000 depending on how much of the existing structure you keep. Call (844) 560-4467 to walk through it.
The test isn’t whether the garage is empty. It’s whether the slab is flat, whether the header over the garage door opening can carry new framing, and whether the ceiling gives you enough interior height after you raise the floor.
What a Garage Conversion ADU in Addison actually involves, stage by stage
Permit and plan review is where the timeline really starts. A garage conversion doesn’t need the full site plan a new detached structure does, but it does need a permit set: a floor plan, an electrical and plumbing diagram, and an insulation schedule showing how you’ll meet the energy code. That review typically runs 3 to 5 weeks in Addison. You’ll decide at this stage whether the conversion gets a full kitchen and laundry or a kitchenette and stackable unit. That choice drives everything downstream.
Week one on site is demo and structural inspection. The existing overhead door, track, opener and any interior wall come out. The old header is inspected and either reinforced or replaced. If you’re raising the slab, it happens here before anything else. Nothing gets buried until the framing inspection passes. You’ll choose here whether the floor stays at slab level (cheaper, but you’ll chase height elsewhere) or gets raised 4 to 6 inches for a flat, dry finish.
The middle of the build is rough-in plumbing, electrical and HVAC, and everything is spaced for finished dimensions, not studs. This is where the biggest cost decisions land. Relocating a water heater that was in the garage, trenching utility lines, adding a drain field, or extending a gas line all move the price. Anything that touches an existing water heater or gas line needs to be done by a licensed professional, and we coordinate those trades. Rough-in inspection happens next.
Insulation and dry-in follow, and this is the stage most people underestimate in North Texas. A garage has zero insulation, so the walls get a full cavity fill and the ceiling gets closed-cell spray foam or a well-air-sealed batt. Windows go in, the old door opening gets framed and sided, and a new exterior door is installed. Drywall and inspections close out.
Finish work is where the calendar is most predictable because everything is already framed and inspected. Trim, doors, flooring, cabinets, counters, fixtures and paint happen in a fixed sequence. A typical garage conversion ADU in Addison finishes in about 12 to 18 weeks from permit plan start, depending on whether you’re adding a full kitchen and full bath, and how quickly selections are made.
The choices that move your Garage Conversion ADU budget most
- Slab-level vs. raised floor: A raised wood subfloor (4 to 6 inches) costs roughly $3,000 to $7,000 more but delivers a dry, level base. A slab-level approach with a moisture barrier is cheaper but forces you to lower ceilings and fight cold floors in winter. For most conversions we recommend the raised option.
- Full kitchen or kitchenette: A full kitchen with a range requires utility commitments and a big share of the budget. A kitchenette with a cooktop and stackable laundry often covers the same market with less cost and fewer compliance questions.
- Bath scope: A half bath only needs a drain, supply and vent for a toilet and sink. A full bath with a tub or walk-in shower adds a drain field and more plumbing. Walk-in shower conversions cost $4,500 – $12,000 on their own. Plan for at least $3,000 to $6,000 in added plumbing labor for a full bath in a former garage.
- Windows and doors: Impact windows on a converted garage usually aren’t added for the same reason as a new home, but they help with insulation and noise. Standard vinyl replacement windows add $4,500 – $15,000 if you’re doing several openings. Paying attention to the new exterior door is worth it here because it replaces the garage door and becomes the primary entry.
- HVAC: A ducted mini-split or a single-zone unit, added to the existing system, generally adds $2,500 to $6,000. For a garage with no existing ducts, a wall-mounted mini-split is usually the better value.
- Exterior cladding: New siding or trim around the old garage door opening is the visible finish. Fibre cement like James Hardie holds up in North Texas sun and is a low-maintenance choice over wood. It adds cost but buys years of no repainting.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
What a Garage Conversion ADU costs in Addison, TX
Most projects land between $45,000 and $130,000. That wide spread comes down to five things: the size of the garage (a single-car is a much smaller footprint than a double), the current condition of the slab, plumbing and electrical, how far plumbing has to travel from an existing source, the material grade you pick for flooring and cabinets, and whether the permit scope includes a full kitchen and bath or just a living space with a bathroom.
| Item | Typical Addison range |
|---|---|
| Garage conversion ADU (typical) | $45,000 – $130,000 |
| Small kitchen remodel inside the conversion | $9,000 – $20,000 |
| Full kitchen inside the conversion | $14,000 – $45,000 |
| Bathroom (full) inside the conversion | $9,000 – $28,000 |
| Small bathroom (half or shower only) | $5,000 – $12,000 |
| Walk-in shower | $4,500 – $12,000 |
| Interior door and trim package | $1,500 – $4,500 |
| HVAC mini-split or added zone | $2,500 – $6,000 |
A written estimate for a garage conversion ADU in Addison includes the permit set, framing and structural work, plumbing and electrical rough-in, insulation, drywall, flooring, doors, trim, the mechanical system, and the exterior cladding at the old door opening. It does not include appliances, furniture, landscaping, or any work on the driveway unless you ask for it as a separate line. Landscaping and driveway work are separate line items. If the conversion is part of a bigger change to the property, homeowners often pair this with Concrete Driveways & Concrete Work in Addison while the equipment and crew are already on site.
Every estimate carries upfront pricing with no surprises: the number you see is the number you pay, and we don’t open the job with a low number and add line items later. Projects over $10,000 get $1,000 off, and 0% financing is available for 18 months if you need to spread the cost.
See the difference
Before
After
Before
After
Before
AfterWhat Addison homes specifically do to a Garage Conversion ADU

Addison is a 4.4-square-mile city that’s nearly built out, and most of what’s left to renovate is older commercial stock. That matters for your garage conversion because the homes and duplexes in this city tend to sit on tight lots where the garage is attached or tucked under the main roof line, not detached and open on three sides. When the garage shares a wall with the house, the conversion has to handle fire separation and the existing roof line. A detached garage gives you more freedom, but you still have to match the exterior finish to the house or it looks added-on.
The other local reality is scheduling. Because Addison is dense with restaurants, hotels and the airport district, most of the construction traffic heads to commercial upfits and redevelopment rather than residential additions. That means a residential garage conversion here gets inspected on the same schedule as everything else, and the permit review queue in Addison is not the same as in surrounding cities. Getting the plan set right the first time saves weeks. North Texas heat also shapes the calendar: exterior work, roofing and concrete happen better in spring and fall, and July and August push interior work indoors if the garage isn’t yet conditioned. In 75001, the existing slab and old garage door opening are usually the two biggest variables, and both are visible on the first walkthrough.
We cover the full Addison area and coordinate inspections so you’re not chasing the city yourself. If you want to see how a garage conversion fits into a larger project, that’s covered on our Home Additions & ADU in Addison page, and the wider scope lives under Home Additions & ADU.
Serving Addison, TX – Our Local Coverage Area
We serve Addison and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in Addison
A typical garage conversion ADU in Addison takes about 12 to 18 weeks from permit plan start to final inspection, with 3 to 5 weeks of that being permit review and the rest split between structural, rough-in, insulation, drywall and finish work. Call (844) 560-4467 for a schedule built around your garage.
Yes, a garage conversion ADU in Addison requires a building permit because you’re changing a non-habitable space to living space, which triggers egress, insulation, electrical and plumbing requirements. We pull the permit and manage the inspections as part of the job. Call (844) 560-4467 to talk through what your specific garage needs.
Sometimes. If the garage shares a wall with an existing bathroom or kitchen, we can often tie into the existing plumbing without moving the main stack, which keeps the cost near the low end of the $45,000 – $130,000 range. If there’s no nearby water source, the plumbing work and sometimes a drain field push the number up. Call (844) 560-4467 for an on-site look.
A garage conversion ADU in Addison runs $45,000 – $130,000, with a full kitchen and full bath at the high end and a living space with a bathroom toward the low end. A written line-item estimate comes free, and projects over $10,000 get $1,000 off. Call (844) 560-4467 for your exact number.
Every garage conversion ADU we build is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s backed in writing and includes the workmanship, not just the materials. Calls are answered by a live person 24/7, so you reach someone when a question comes up. Call (844) 560-4467 to schedule your free estimate.
Schedule your free garage conversion estimate in Addison

A garage conversion ADU in Addison is a permit-driven project, and the first visit is where it either gets cheaper or more expensive. We’ll walk the slab, check the header over the old door opening, look at the plumbing tie-in and give you a written line-item estimate with upfront pricing. Estimates are free, and the call is answered by a live person 24/7. Call (844) 560-4467 to schedule yours.