New Detached ADU in Paloma Creek South, TX: What It Takes to Build One Here
A new detached ADU in Paloma Creek South, TX typically runs $45,000 – $130,000 and takes five to eight months from first sketch to final inspection, with the bulk of that time sitting in Denton County review and HOA architectural approval rather than hammer-and-nail work. The structure itself is a separate, self-contained home on your lot: its own foundation, its own meter, its own address. Call (844) 560-4467 and we’ll walk your lot and your plat before anyone quotes a number.
How a Detached ADU Gets Built Here, Stage by Stage

Every detached unit follows the same arc. What changes is how long each stage sits in review, and in Paloma Creek South that review is the part most homeowners underestimate.
- Stage 1: Feasibility and lot survey (1 – 2 weeks). We pull your plat, check setbacks against both city and developer-era HOA rules, and confirm where the unit can legally sit. You decide the footprint and whether it’s a one-story or two-story build. This is where most surprises surface, and we’d rather find them now than after a slab is poured.
- Stage 2: Design and HOA submittal (4 – 10 weeks). Architectural drawings go to the HOA architectural review board for exterior approval, then to Denton County and the city for permit. You’ll pick siding material and color, roof pitch, and door and window styles at this stage, because those are the exact items the review board scrutinizes. Expect at least one round of comments.
- Stage 3: Site prep and flatwork (2 – 3 weeks). Utility locates, grading, and the slab or pier-and-beam foundation. On North Texas clay, the foundation detail matters more than anything else in the build. You decide whether to run a separate utility trench for full independence or tie into the main house.
- Stage 4: Framing, rough-in, and dry-in (6 – 10 weeks). Walls, roof, then plumbing, electrical, and HVAC rough-in, each with its own inspection before anything gets covered. This is the longest stretch of actual construction, and the one where the schedule is most exposed to weather.
- Stage 5: Finishes and final inspection (4 – 6 weeks). Insulation, drywall, flooring, cabinets, fixtures, paint, and the punch list. You’ll make the finish selections back in Stage 2 so nothing stalls here. Final inspection clears the unit for occupancy.
Throughout, our technicians have up to 12 years of experience on residential additions, and every project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. Calls are answered by a live person, 24/7, so a question about your inspection date doesn’t wait until Monday.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make on a Detached Unit
A detached ADU is a small house, which means you’re making house-level decisions, not remodeling decisions. Here’s what comes up, and the honest trade-off on each.
- Foundation type. Slab-on-grade is the standard for these lots and the cheaper path. Pier-and-beam costs more upfront but gives you access to plumbing underneath, which matters more than usual on expansive clay soil that moves with the seasons.
- Siding and roof pitch. Brick veneer and fiber-cement lap siding are the two approvals that clear most review boards here, since they match the surrounding production-built homes. Composition shingles from CertainTeed or Owens Corning are the default; a steeper pitch sheds North Texas hail-season rain better but adds framing cost.
- Door and window style. Exterior door style and color are the single most common HOA comment item. We’ll pull approved options before you fall in love with a color, and Andersen and Pella both offer finishes that pass review in most Paloma Creek South communities.
- Layout efficiency. A one-bedroom studio with a combined living and sleeping area fits comfortably in 500 – 650 square feet. A true one-bedroom with a separated bedroom runs larger and costs more in both framing and finish, but rents and resells better.
- Utilities. Separate metering is cleaner for rental use and adds cost; tying into the main service is cheaper but blurs the line between the two structures for resale and for any future rental arrangement.
This job often sits inside a bigger plan, so if you’re weighing it as part of a full Home Additions & ADU in Paloma Creek South scope, the sequencing can save you money on shared flatwork. You can also read more about our wider Home Additions & ADU service if you’re still deciding between a detached unit and an attached addition.
What a New Detached ADU Costs in Paloma Creek South, TX

Plan on $45,000 – $130,000 for a detached ADU in Paloma Creek South. The low end is a compact studio on a slab with standard finishes and utilities tied into the main house. The high end is a larger one-bedroom with a full kitchen, separate metering, upgraded finishes, and a brick exterior that clears a strict review board.
Here’s what moves the number:
- Square footage. The biggest single lever. Every additional 100 square feet adds framing, foundation, roofing, insulation, and finish cost in proportion.
- Utility scope. A separate trench, meter, and panel is a meaningful jump over tying into the existing service.
- Site work. A flat, clear lot is cheap. Clay soil correction, grading, or a challenging setback that forces a longer utility run all push you toward the top of the range.
- Finish grade. Standard builder-grade cabinets and flooring versus upgraded cabinets, tile, and fixtures can swing the interior budget considerably.
- HOA and permit scope. A unit that triggers extra review cycles or structural engineering adds time and cost before a shovel ever hits the ground. We pull the permits and see them through inspection as part of the job.
Your written estimate will be line-item, not a lump sum. It covers design coordination, permit fees, foundation, framing, roofing, mechanical rough-in, insulation, drywall, flooring, and fixtures. What typically sits outside it: landscaping and sod repair after construction, fencing around the new unit, and any HOA application fees the community charges directly. Pricing is upfront and the number you see is the number you pay, with 0% financing for 18 months available and $1,000 off projects over $10,000.
See the difference
Before
After
Before
After
Before
AfterWhat Paloma Creek South Homes Specifically Do to This Job
Paloma Creek South is a master-planned, build-out suburb along the US 380 corridor in Denton County, and nearly all of it is production-builder housing from the 2000s and 2010s. That changes this job in a way it wouldn’t in an older town. On these lots, the developer-era HOA architectural review often dictates what you can build before the city permit even becomes relevant. Setbacks, exterior color changes, and roof pitch all route through an approval board first, and the review usually runs several weeks before your plans reach the city counter.
The soil is the other local constant. North Texas clay shrinks and swells through the seasons, and on a slab-on-grade build we spec the foundation accordingly rather than assuming a standard detail will hold. Tight plats in the newer phases also mean the utility trench may not run where you’d expect, which is why the Stage 1 survey matters. When we work across Paloma Creek South, we check both the plat and the community rules before quoting, because a unit that fails review costs you months.
Homeowners often pair a new unit with fresh flatwork, and we handle Concrete Driveways & Concrete Work in Paloma Creek South for the new approach and pad. If you want a paved walkway to the unit instead, Paver Driveways in Paloma Creek South is the other path.
Serving Paloma Creek South, TX – Our Local Coverage Area
We serve Paloma Creek South and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: New Detached ADU in Paloma Creek South

Five to eight months, with four to ten weeks of that in HOA architectural review and city permitting before construction starts. The build itself typically runs three to four months of active work. Call (844) 560-4467 and we’ll give you a timeline tied to your specific plat.
Yes on both, and in Paloma Creek South the HOA review usually comes first. The community’s architectural review board approves exterior design, color, and placement before the city permit process begins, and skipping it risks a violation. We coordinate the entire submittal so both approvals move in the right order.
Yes. A fully detached unit has its own systems, so there’s no rerouting inside your existing home. The only shared question is whether you want a separate utility trench and meter for the new structure or want to tie into the main service, and that’s a cost and metering decision, not a structural one.
Between $45,000 and $130,000, driven mainly by square footage, utility scope, and finish grade. A compact studio on a simple lot lands near the low end; a full one-bedroom with upgraded finishes and separate metering sits near the top. Call (844) 560-4467 for a line-item estimate on your lot, free of charge.
Every project is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship on the structure and systems we install. Our technicians have up to 12 years of experience on residential additions, and all arrive background-checked and in uniform.
Get a Free On-Site Estimate for Your Detached Unit
Call (844) 560-4467 to schedule a free estimate for a new detached ADU in Paloma Creek South. We’ll walk your lot, check the plat and the community’s architectural rules against your plans, and hand you a written line-item quote with a realistic timeline. A live person answers around the clock. Estimates are free, and there’s no pressure to book the job that day.