ADU Site Prep & Utilities in Plano - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Plano: What It Costs and What It Actually Takes

ADU site prep and utilities in Plano runs $45,000 – $130,000 as a standalone scope, covering grading and drainage, the slab or pier foundation, and bringing water, sewer, gas and electrical to the unit. Most of that work happens in the first three to six weeks of an ADU build, before framing starts. Call (844) 560-4467 and we’ll walk your lot and give you a written, line-item estimate for the site and utility portion alone.

Call (844) 560-4467

Here’s the part most Plano homeowners don’t hear until they’re already committed: the site and utility work is the least visible phase of the project and the one most likely to blow a budget. You can’t see it when it’s done, you can’t easily verify it later, and it’s where a cheap bid turns expensive.

How we run an ADU site and utility job in Plano, stage by stage

A second-story addition that matches the existing roofline

Site prep and utilities aren’t one phase. They’re a sequence of decisions and inspections, and each stage has to close before the next one opens. Here’s the order we work in and what you’ll be asked to decide at each stop.

Stage 1: Lot survey, utility locate, and dirt work (days 1 – 3)

We start by marking the build envelope and calling in the utility locates so nobody puts a shovel through a gas line. Then we strip topsoil, grade the pad to the drainage plan, and rough out positive fall away from the future structure. On Plano’s expansive clay, this is also where you decide whether you’re building on a reinforced slab or a pier-and-beam foundation. That choice is made now, not later. A few days of dirt work decides how the next two years go.

Stage 2: Foundation and underground plumbing (days 4 – 10)

With the pad set, we form and pour the slab or set piers, then rough in the sewer and water lines underneath and through it. This is the one stage where mistakes are nearly permanent. Sewer slope gets verified by inspection before anything gets covered. You’ll sign off on the fixture locations here: where the bathroom drains, where the kitchen sink drops, where the washer ties in. Expect roughly a week, weather permitting.

Stage 3: Electrical and gas rough-in (days 8 – 14)

While the foundation cures, the trenching and rough-in work runs in parallel. We trench from the main dwelling to the ADU for electrical conduit and gas, set the meter or subpanel plan, and rough in the branch circuits. You decide the service size now: a 60-amp subpanel is common for a studio ADU, but an ADU with a heat pump, an induction range and an EV charger needs 100 amps. Oversizing now costs a fraction of upgrading later.

Stage 4: Inspections and utility connections (days 14 – 21)

City of Plano inspections for foundation, underground plumbing, and electrical rough-in run during this window. Plano is stricter than most Collin County cities on documentation and inspection scheduling, so this is the stage where calendar time is won or lost. We schedule inspections before the trench closes, not after. Once you pass, the utility connections get made and the meters set.

Stage 5: Backfill, final grade, and drainage (days 21 – 30)

We backfill the trenches in lifts, compact as we go, and restore the final grade to the drainage plan, including swales or French drains where the lot needs them. You decide hardscape tie-ins here: whether the ADU’s walkway connects to your existing drive, or whether that’s a separate job you handle later. This is also the stage where homeowners often pair the utility trench work with a new approach, which is why so many add Concrete Driveways & Concrete Work in Plano to the same schedule window.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually change the number on your ADU site work

Almost every dollar swing in this scope comes down to five decisions. Here’s the honest version of each.

  • Foundation type: slab vs. pier-and-beam. A post-tension slab is faster and typically cheaper on stable, graded soil. Pier-and-beam handles Plano’s shrink-swell clay and movement better and keeps plumbing accessible, but it adds cost and time. On a lot with old tree roots and active clay, it’s often worth it.
  • Utility distance and trench route. An ADU 20 feet from the main house ties in cheaply. An ADU 90 feet back in the yard means a longer trench, deeper gas line, larger conduit, and possibly a lift pump for sewer. Distance is one of the biggest cost variables, and it’s fixed by the lot, not the budget.
  • Electrical service size. A 60-amp subpanel is fine for a studio with a mini-split and a small range. A 100-amp service with a heat pump, induction cooktop and an EV charger is a different job. Decide the appliance list before the trench is dug.
  • Drainage and grading complexity. A gently sloped lot needs a swale. A flat lot with clay and a wet corner may need a French drain, a dry well, or a re-graded pad. This is the line item that turns a $45,000 scope toward $80,000 without anyone changing the ADU’s footprint.
  • Right-of-way and utility tap fees. Connecting to city water and sewer can involve tap fees and meter charges billed by the utility, not by us. Those are passed through at cost and shown separately on your estimate, so there’s no mystery number.

What ADU Site Prep & Utilities costs in Plano, TX

A framer checking new wall framing on a home addition

For a typical detached ADU on a Plano lot, the site prep and utility scope alone runs $45,000 – $130,000. That’s the dirt, the foundation, the trenching, the rough-ins, the connections and the final grade. It doesn’t include the ADU structure itself, which lives in the broader Home Additions & ADU in Plano scope.

Here’s how the line items break down on a written estimate:

Line item Typical range
Site survey, locates, demo and grading $3,000 – $9,000
Foundation (slab or pier-and-beam) $9,000 – $28,000
Underground plumbing and sewer tie-in $6,000 – $18,000
Electrical trench, conduit and service $5,000 – $14,000
Gas line and meter work $2,500 – $7,000
Final grade, drainage and restoration $4,000 – $12,000
Utility tap and meter fees (pass-through) Varies by utility

Pushing toward the low end: a compact ADU close to existing utilities, a flat and stable pad, a slab foundation, a modest electrical service, no drainage problem to solve.

Pushing toward the high end: a long utility run to the back of the lot, active clay movement requiring pier-and-beam, a flat lot needing drainage, a 100-amp service with EV and heat pump provisions, and a sewer lift pump.

Every estimate we write is line-item, upfront, and fixed. If the job doesn’t change, the price doesn’t change.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Plano specifically changes this job

Plano is a built-out first-ring suburb. Almost nobody here is working on open dirt. Almost every ADU site job is carved out of an established yard in a mature neighborhood, alongside a house that’s been sitting on the same clay for thirty or forty years. That changes the work.

In the older central and east Plano corridors (75023, 75074, 75075), the original 1970s and 1980s homes have yards full of established trees, aging irrigation lines, and sometimes original utility runs that are already at the end of their life. We find them on every job. That’s where the surprise costs come from, and it’s why we open a trench carefully rather than quickly. In the west-side ZIPs (75024, 75093) the housing is newer, but the lots are tighter and HOAs are more involved, so the ADU setback and the trench routing get reviewed before a shovel touches dirt. Plano enforces its property-maintenance and permitting regime more strictly than surrounding Collin County cities, and that includes HOA architectural review, which has to clear before work starts. We build the schedule around that review, not against it. And because the region’s expansive clay soil is a constant, we treat foundation selection as a site-specific decision on every Plano lot, never a default.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Plano

A remodeled primary bathroom with a soaking tub and walk-in shower

Get a free estimate for ADU Site Prep & Utilities in Plano

No ADU gets built on a guess. Call (844) 560-4467 and we’ll set a free on-site estimate for the site and utility scope, walk your lot, confirm where the utilities run, and hand you a line-item number in writing, with permits pulled and inspections passed. That’s part of our Home Additions & ADU service, and we cover Plano and neighbors like Richardson, Addison, Carrollton and The Colony. Homeowners often pair the trench work with a new approach, so ask about Paver Driveways in Plano while we’re on site.

Our technicians have up to 12 years of experience, and every job carries our 730-Day Done Right Promise. Questions during the process? Live person, 24/7, no voicemail.

Written by the team at Groundwork Construction Co.

Why Plano Chooses Groundwork Construction Co. of Lewisville

We set the standard for ADU site prep & utilities in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodel

More services in Plano

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Plano?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Plano.

(844) 560-4467

Request a Free Estimate in Plano

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch