A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Irving, TX

ADU Design & Permitting in Irving - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Irving, TX: What It Actually Involves

ADU design and permitting in Irving, TX typically runs $45,000 – $130,000 for the full project and takes 4 – 7 months from first sketch to final inspection, with design and city approval eating 8 – 14 weeks of that before a shovel hits the ground. The design-and-permit phase itself usually costs $6,000 – $18,000 depending on whether you need structural engineering, a survey, and a variance. Call (844) 560-4467 to schedule a free on-site estimate and talk through what your lot can hold.

Call (844) 560-4467

How the Design and Permit Process Actually Runs

A finished backyard cottage with a small covered porch

Most homeowners assume they pick a plan, hand it to the city, and start building. The real sequence has more steps, and each one has a decision only you can make. Here’s how it plays out.

Stage 1: Site visit and feasibility (days 1 – 3)

We walk the lot, measure setbacks, check where the sewer tap and electrical panel sit, and confirm what the zoning allows for your parcel. You decide at this stage whether you’re pursuing a detached unit, an attached addition, or something inside the existing footprint. In Irving, the answer often turns on how much rear yard clearance you actually have, not on what you want.

Stage 2: Schematic design (weeks 2 – 4)

A designer draws the floor plan and elevations to your rough size and layout goals. You approve the footprint, the roofline, and the door and window placement. This is the cheapest moment to change your mind, so we push hard for decisions here. Most Irving lots inside the 75060 and 75061 ZIP codes have tight side yards, which drives the footprint before finishes ever come up.

Stage 3: Construction drawings and engineering (weeks 4 – 8)

Architectural sheets get paired with structural engineering, a foundation plan sized for Irving’s expansive clay, and a mechanical, electrical, and plumbing layout. You choose exterior finish direction here (brick veneer to match the house, fiber cement, or stucco) because it affects both the drawings and the budget. Our technicians have up to 12 years of experience reading these plans on site, so what gets drawn is what gets built.

Stage 4: Permit submission and plan review (weeks 8 – 14)

We submit to the City of Irving and manage the review comments. Plan reviewers will ask for corrections, and how fast those get answered is the single biggest swing factor in the timeline. You sign off on any revisions and pay permit fees. If your property sits in a planned community with design review, that approval runs parallel to the city review, not after it.

Stage 5: Permit issued and pre-construction (week 14 onward)

Once the permit is in hand, we lock the schedule, confirm material lead times, and set the inspection milestones. You get a written line-item scope before a single trade mobilizes. This is also when we finalize the construction contract, and the number you sign is the number you pay.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Spec Choices You’ll Weigh

An ADU’s cost is mostly driven by decisions you make in weeks two through six. Here’s what actually moves the needle.

  • Detached versus attached. A detached unit gives privacy and rental flexibility but needs its own foundation, utility trench, and roof. An attached unit shares a wall and a roofline, which saves $15,000 – $35,000 but ties you to the main house’s footprint.
  • Foundation type. Irving’s black-clay soil moves seasonally. A post-tension slab handles it well and costs less upfront; a pier-and-beam approach costs more but is easier to level later. We size the foundation to your specific lot, not a stock detail.
  • Exterior skin. Brick veneer matches the 1950s – 60s south Irving housing stock and holds up under hail. Fiber cement gives you color flexibility at a lower price. Stucco is the cheapest of the three but needs repainting sooner in DFW heat.
  • Roofing. A Class 4 impact-rated shingle assembly costs more than standard architectural shingles but earns insurance relief, and hail is a recurring reality here. We can spec GAF or CertainTeed systems to match the main house.
  • Systems and layout. A full kitchen and laundry drive plumbing cost up fast. A kitchenette and stacked washer-dryer keep it lower. Mini-split HVAC is cheaper and easier to zone than extending the main system.

What ADU Design & Permitting Costs in Irving, TX

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for the full ADU project, with $6,000 – $18,000 of that going to design and permitting before construction starts. Here’s how the design-and-permit piece breaks out:

Line item Typical Irving range
Feasibility review and schematic design $2,500 – $6,000
Construction drawings $3,000 – $8,000
Structural engineering and foundation plan $1,200 – $3,500
Survey and site plan $600 – $1,800
City permit and plan review fees $1,500 – $5,000
Variance or design review application (if needed) $400 – $2,000

What pushes a job toward the high end: a detached unit on a lot that needs a variance, structural work to tie into an older slab, or a planned community requiring design review. What keeps it low: an attached layout, a straightforward rear-yard placement with clean setbacks, and standard finishes.

A written estimate from us includes the design scope, the permit management, and the full construction line items with fixed pricing. It does not include utility tap fees the city charges separately, HOA fees, or site conditions we can’t see until demo, such as a failing sewer line. Those get flagged before work starts, never as a mid-job surprise. Call (844) 560-4467 for an exact quote. Estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Irving Homes Specifically Do to This Job

Irving splits into two construction worlds, and ADU work here feels both of them. In the older core along the 183 corridor, ZIP codes like 75060 and 75061, the housing stock is mostly post-war brick-veneer on slab. That means slab foundations that have moved on expansive black-clay soil, and an ADU tied into that footprint has to account for where the existing slab has already shifted. We see this constantly in neighborhoods off Story Road and Rock Island. Permitting in these ZIPs is usually straightforward, but the site work is not, because tear-out, re-pipe, and drainage correction often come with it.

Then there’s the Las Colinas and Valley Ranch side, where planned-community design review runs alongside city plan review. Those HOAs have their own elevation and material rules, and a plan the city approves can still fail architectural review. We build the schedule around both approvals in parallel. Long hot summers and spring hail also shape when foundation pours and roofing actually happen, so the calendar matters as much as the drawings. You can see how this job fits a broader project on our Home Additions & ADU in Irving page.

Serving Irving, TX – Our Local Coverage Area

We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Design & Permitting in Irving

New architectural shingles with a clean valley

Get a Free Estimate for Your Irving ADU

We’ll come out to your Irving property, walk the lot, and give you a written estimate covering design, permitting, and construction with fixed pricing. Homeowners often pair this with Paver Driveways in Irving or Chain Link Fence in Irving around the same time. Call (844) 560-4467 and a live person picks up any hour. Learn more about our Home Additions & ADU work and see how we cover Irving.

Written by the team at Groundwork Construction Co.

Why Irving Chooses Groundwork Construction Co. of Lewisville

We set the standard for ADU design & permitting in Irving.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Irving

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Irving Customers Say

Trusted by homeowners across Irving and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gate

More services in Irving

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Irving?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Irving.

(844) 560-4467

Request a Free Estimate in Irving

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch