A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Lewisville, TX

ADU Site Prep & Utilities in Lewisville - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Lewisville: What the Work Actually Involves

ADU site prep & utilities in Lewisville runs $45,000 – $130,000 for the sitework and utility package that has to be finished before a detached unit gets framed, and it usually takes 3 – 6 weeks from first dig to passed inspections. The low end is a flat, dry lot with the main house panel and sewer tap close by. The high end is a lake-adjacent or floodplain lot that needs drilled piers, a longer utility run, and elevation documentation. Call (844) 560-4467 and we’ll walk your lot and give you a written, line-item number.

Call (844) 560-4467

How the site prep and utility sequence runs, stage by stage

A single-story rear room addition with tall windows and a new patio

This is the part most homeowners underestimate. The shell of an ADU goes up fast once the pad is ready. Getting the pad ready is where the schedule actually lives, and in Lewisville the clay decides a lot of it.

Stage 1: Locate, stake, and utility locate (days 1 – 2)

We call in the 811 locate for existing gas, water, electric, and telecom before anything gets cut. On lots in Old Town where the original service lines were run decades ago, we often find the water line isn’t where the plat drawing says it is, and that changes where the tap goes. You decide the ADU footprint and orientation at this stage, because it drives everything downstream.

Stage 2: Clearing, grading, and cut-to-grade (days 3 – 6)

We strip the topsoil, cut the pad to the engineered elevation, and grade for positive drainage away from both the ADU pad and the main house. On a lot with a slope toward the Elm Fork side, this is where we build in the swale and set the finished floor above the flood elevation the survey shows. You’ll want a current elevation certificate in hand if your lot touches a mapped flood zone.

Stage 3: Foundation and pier work (days 7 – 14)

This is the black gumbo clay stage. Lewisville’s soil expands and contracts hard with the wet-dry cycles, so a conventional footing alone often isn’t enough. We set drilled piers or a post-tensioned slab depending on the geotech result and the ADU size. You approve the foundation type and the structural drawings before we pour. No pour happens without an inspection.

Stage 4: Utility trenching and rough-in (days 10 – 20, overlapping the foundation cure)

Water, sewer, gas, and electric get trenched from the main house or the street to the ADU. Where the main panel has spare capacity, we run a feeder from it; if it doesn’t, an electrical upgrade or a separate service enters the picture and the price moves. Sewer slope has to be right the first time. You decide the utility routing and whether the ADU gets its own meter or sub-meters off the house.

Stage 5: Inspections, backfill, and handoff to framing (days 21 – 30)

The city inspects the underground plumbing, the electrical rough-in, and the foundation before we backfill. Failing an inspection means re-digging, so we build the schedule around passing the first time. Once those pass and the pad is clean, framing can start. That’s the handoff line we hold ourselves to.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The site and utility choices you’ll actually be deciding between

Nothing here is cosmetic. Every choice below changes either the permit scope, the foundation spec, or the monthly bill once the unit is occupied.

  • Post-tensioned slab vs. drilled piers. A post-tensioned slab is common on flat lots with moderate clay and runs less than a full pier system. Drilled piers cost more but hold up better where the soil is most active or the lot has a slope. We let the geotech report make the call, not a guess.
  • Utility trench length. An ADU pad placed close to the main house and existing taps keeps trenching short. Push the pad to the back fence for privacy and you pay for every extra foot of water, sewer, gas, and conduit.
  • Electrical service. Tapping the existing panel is the cheapest route if there’s room. A dedicated meter or upgraded service adds cost but makes the unit easier to rent or meter separately later.
  • Sewer vs. septic. Most Lewisville lots tie into city sewer. A lot that can’t reach a sewer line at a workable slope may need a grinder pump or an alternate system, and that’s a meaningful jump in both cost and permit complexity.
  • Drainage and stormwater. French drains, a retention swale, or a dry well keep the pad and the main house dry through a North Texas spring. Skip it and you’ll be dealing with a wet slab and a muddy yard every heavy rain.

What ADU site prep and utilities costs in Lewisville, TX

A framer checking new wall framing on a home addition

For the sitework and utility package alone, plan on $45,000 – $130,000. That’s the prep, foundation, and utility scope, not the finished building. Here’s the line-item view:

Scope Typical range
Clearing, grading, and pad prep $4,000 – $12,000
Foundation, slab or piers $12,000 – $40,000
Water, sewer, and gas trenching and hookups $8,000 – $28,000
Electrical service and conduit run $6,000 – $22,000
Drainage, grading, and stormwater work $3,000 – $12,000
Permits, survey, and inspections $2,500 – $9,000

What pushes a job toward the top of that range: an active-clay lot that needs full piers, a long utility run to a far pad, a panel that needs upgrading, a floodplain elevation requirement, or a slope that needs real drainage work. A flat lot with the taps close and spare panel capacity lands near the low end. A written estimate includes everything above plus the geotech and survey reports. It typically excludes the finished building itself, landscaping restoration beyond rough grade, and any city impact or utility-connection fees that get billed separately. Our pricing is upfront and fixed. The number you see is the number you pay, with no change orders mid-dig.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Lewisville lots and soil do to this job

Lewisville is a two-speed market, and the sitework feels it. In Old Town and the older core near the lake, you’re often working around 1960s to 1980s brick ranch homes on aging slabs and pier-and-beam foundations, where the original utility lines and lot grading have shifted over decades. Up in the northern growth zones, brand-new subdivisions mean fresh infrastructure but lots graded fast, and expansive clay still waiting to move. The defining issue is that gumbo clay. It heaves in a drought-then-flood spring, so slab foundations on older properties are constantly being leveled and new pads need piers or post-tensioning from day one. If your lot sits near Lewisville Lake or the Elm Fork Trinity River, expect Corps of Engineers lake permitting on the water side and floodplain elevation documentation for anything in a mapped zone. That’s an extra review step and an extra 1 – 2 weeks on the front end. We pull the permits and hold the inspections for Lewisville projects, and we’ve learned the front end is where a job either stays on schedule or doesn’t. This package is usually part of a full Home Additions & ADU in Lewisville plan, and homeowners often pair the finished ADU with new flatwork, like Concrete Driveways & Concrete Work in Lewisville or Paver Driveways in Lewisville, to tie the yard together once the unit’s in.

Serving Lewisville, TX – Our Local Coverage Area

We serve Lewisville and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Lewisville

A new paver pool deck

Get a free on-site estimate for your ADU site work

Start with a free on-site estimate for ADU site prep & utilities in Lewisville. We walk the lot, check the soil and drainage, confirm where your utility taps are, and put a written, line-item number in your hands. Call (844) 560-4467 to schedule it. A live person picks up, and we’ll tell you what your lot needs before you commit to a dollar. Estimates are free and there’s no pressure to book.

Written by the team at Groundwork Construction Co..

Why Lewisville Chooses Groundwork Construction Co. of Lewisville

We set the standard for ADU site prep & utilities in Lewisville.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Lewisville

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Lewisville Customers Say

Trusted by homeowners across Lewisville and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new roof with clean valleys and new flashing

More services in Lewisville

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Lewisville?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Lewisville.

(844) 560-4467

Request a Free Estimate in Lewisville

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch