Cabinets & Countertops in Richardson, TX: What the Job Actually Costs and How Long It Takes
Cabinets and countertops in Richardson, TX typically run $14,000 – $45,000, with the cabinet build and install taking three to five working days and the countertop template-to-install cycle adding another seven to fourteen. In a 1950s – 1980s Richardson ranch, most of that calendar is prep: checking that the walls are plumb after sixty-plus years on North Texas clay. Call (844) 560-4467 for a free on-site estimate and a written line-item quote before you commit to anything.
How a Cabinet and Countertop Job Actually Runs, Stage by Stage

Cabinet and countertop work is a sequence, not a single visit, and the schedule moves at the pace of the slowest step. Here’s what our crews do and when you make decisions.
Stage 1: Measure and confirm (Day 1, about 90 minutes)
We measure every wall to the sixteenth of an inch, note the out-of-plumb corners that old Richardson homes always have, and confirm box sizes, door style, and finish. You decide the cabinet line, door profile, and hardware here. Anything you change after this point resets the order clock.
Stage 2: Order and lead time (3 – 6 weeks, nothing happens in your kitchen)
Semi-custom boxes take the longest. This is the quiet stretch where the homeowner second-guesses the finish color. We confirm the order, set a delivery window, and lock the install date so the countertop fabricator can be scheduled against it.
Stage 3: Demo and prep (2 – 3 days)
Old cabinets come out, and the wall behind them gets inspected. In Richardson’s older stock this is where surprises show up: water damage under the sink, a wall that isn’t square, an outlet that needs to move. We frame and shim so the new boxes sit level even if the room doesn’t. Plumbing and electrical rough-in happens now, not later.
Stage 4: Cabinet install (3 – 5 days)
Base and wall cabinets go in, leveled and shimmed, then doors, drawers, and hardware. This is the day the kitchen starts looking like a kitchen again. You walk the layout before the countertop template is cut.
Stage 5: Template and countertop install (7 – 14 days after template)
Stone is templated after the cabinets are set, cut off-site, and installed in a single visit. Sink and faucet tie-in happens the same day. Most homeowners are back to a working kitchen within 24 hours of the countertop going down.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make, and What Each One Costs You
Almost every decision in this job comes down to a trade-off between money, durability, and how long you plan to stay. Here’s the honest version.
- Stock vs. semi-custom cabinets. Stock boxes are cheaper and faster but come in fixed sizes, so a 63-inch wall gets filler strips. Semi-custom lets you size to the wall and pick the finish, at a real premium.
- Plywood vs. particleboard boxes. Plywood holds up better to North Texas humidity swings and repeated door-slam cycles. Particleboard is fine in a dry, low-traffic kitchen and costs less.
- Quartz vs. granite countertops. Quartz (we install Caesarstone among others) is non-porous and needs no sealing. Granite is natural stone, unique per slab, and needs resealing roughly once a year. Both handle a hot pan better than laminate.
- Undermount vs. drop-in sink. An undermount sink with a solid-surface counter looks cleaner and wipes straight into the bowl, but it must be specified before the template is cut. A drop-in (Blanco makes solid options) can go in later but leaves a visible rim.
- Full-height backsplash vs. a 4-inch splash. Full-height is a bigger material and labor line; the short splash protects the wall behind the counter and nothing more.
Faucet and sink hardware (Moen, Kohler, and similar) is a place to spend a little more than you planned. It’s the part you touch every day and the part that fails first.
What Cabinets & Countertops Cost in Richardson, TX

The lead range for cabinets and countertops in Richardson is $14,000 – $45,000. Where a project lands inside that window depends on five things:
- Linear feet of cabinetry. A galley kitchen and a U-shaped layout are different jobs, and cabinet cost scales with box count, not square footage.
- Cabinet grade. Stock, semi-custom, and custom boxes can swing the cabinet line alone from roughly $4,000 up to $13,000.
- Countertop material and edge. Countertop installation in Richardson runs about $2,000 – $6,500, and a thick mitered edge or a waterfall island pushes toward the top.
- Moving plumbing or electrical. Relocating a sink or adding circuits means rough-in work and, in some cases, a permit and inspection.
- Existing condition. Water damage, an out-of-level wall, or a floor that needs leveling after years on expansive clay all add labor before the new cabinets go in.
A written estimate should list cabinets, countertop material and fabrication, demo, install labor, and sink/faucet set by line item. It typically does not include appliance costs, drywall repair beyond the cabinet footprint, or flooring. Upfront pricing means the number on the quote is the number you pay. Call (844) 560-4467 for an exact quote, estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhy Richardson Homes Make This Job Different
Richardson is Telecom Corridor country, and its post-war core was built almost entirely between the late 1950s and early 1980s. That means most cabinets and countertops we replace here are original or second-generation, in small mid-century ranch kitchens that were never designed for a modern appliance footprint. Homes in ZIPs 75080 and 75081 share remarkably uniform construction and floor plans, so our crews already know where the plumbing stack sits and how the walls were framed before we open anything up.
Two things show up on nearly every job. The black gumbo clay under Richardson’s slab foundations swells and shrinks hard between drought and wet seasons, so a kitchen wall that was plumb in 1975 often isn’t now. We shim and level the new cabinets rather than trusting the wall. And in the oldest pockets, original wiring and cast-iron drains are common, which is why we open the wall before ordering anything that can’t be returned. If the cabinets are part of a wider scope, see our Kitchen Remodeling in Richardson page for the full picture.
Permits matter here. Anything that moves plumbing, gas, or electrical typically needs a permit and an inspection in Richardson, and we pull them and pass them. Call (844) 560-4467 to schedule a free on-site estimate.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Richardson

Plan on four to seven weeks start to finish, and most of that is cabinet lead time. The on-site work is roughly one to two weeks: two to three days of demo and prep, three to five days of cabinet install, then seven to fourteen days for the countertop template and install. Call (844) 560-4467 for a free estimate and a firm schedule for your kitchen.
Straight replacement in the same footprint usually doesn’t require one, but any move of plumbing, gas, or electrical does. We pull the permits and handle the inspections when the scope calls for it. Call (844) 560-4467 and we’ll tell you up front whether your job needs a permit.
Yes. Keeping the sink and range where they are is the single biggest cost saver in the job, and most Richardson kitchens don’t need to move anything. The countertop and cabinet footprint stays in the same place and the price drops toward the low end of the range. Call (844) 560-4467 for a free estimate on a like-for-like replacement.
The range is $14,000 – $45,000, with cabinet installation around $4,000 – $13,000 and countertop installation around $2,000 – $6,500 of that total. Material grade, linear feet, and whether you move plumbing or electrical decide where you land. Call (844) 560-4467 for an exact quote, estimates are free.
Every job is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right, one of the longest workmanship guarantees in residential construction. Manufacturer warranties on cabinets, sinks, and faucets pass through to you. Call (844) 560-4467 to schedule a free estimate.
Get a Free Estimate for Cabinets & Countertops in Richardson
Call (844) 560-4467 and a live person picks up, day or night. We’ll ask about your kitchen’s size, your cabinet and countertop preferences, and whether anything needs to move, then set a free on-site visit. You leave the visit with a written line-item quote, no change orders, and 0% financing for 18 months plus $1,000 off projects over $10,000 if you decide to move ahead. Our technicians have up to 12 years of experience, and we cover Richardson and the surrounding area. Homeowners planning a bigger overhaul often pair this with a Garage Conversion ADU in Richardson, and if they need more room for family, a New Detached ADU in Richardson handles the space question. Where this connects to a wider renovation, our Kitchen Remodeling service is the place to start.