A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Richardson, TX

Garage Conversion ADU in Richardson - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Richardson: What It Takes and What It Costs

A garage conversion ADU in Richardson typically runs $30,000 to $80,000, with the full range for this kind of work landing between $45,000 and $130,000 once you’re adding a bathroom, kitchenette, and separate HVAC system. The build takes four to six months from the first day of demo to the final inspection, and most of that time is permitting and rough-in work, not finish carpentry. Call (844) 560-4467 to schedule a free on-site estimate.

Call (844) 560-4467

A remodeled family room with new windows and a window seat

Every garage conversion follows the same backbone. The difference between a smooth four-month build and a six-month slog is how much gets decided before demo starts. Here’s the actual order of events.

Stage 1: Assessment and design (weeks 1 – 3)

We start by reading the garage itself, not the floor plan. Is the slab monolithic or a separate pour? Is there a step-down from the house, and how deep? Where does the electrical panel sit, and does it have capacity for a subpanel? Are the garage walls shared with the house (attached) or freestanding? You’ll decide the layout in this stage: studio versus one-bedroom, where the bathroom goes, and whether you want a kitchenette or just a wet bar. That decision drives everything downstream, so it’s the one to take your time on.

Stage 2: Permits and engineering (weeks 3 – 6)

Richardson requires a building permit for any garage conversion, plus separate electrical, plumbing, and mechanical permits. Depending on the garage’s construction, you may also need a stamped structural letter or foundation inspection by a Texas-licensed engineer. We pull the permits, coordinate the submittal, and absorb the back-and-forth with the city. You’ll get a copy of the approved plans before a single hammer swings.

Stage 3: Demo and shell work (weeks 6 – 9)

Day one is demo: pulling the garage door and opener, removing any shelving or lift hardware, stripping old drywall where it’s suspect, and cutting the slab for plumbing. If the garage door opening is being infilled, that happens here, framed and sheathed to match the house exterior. We inspect and replace any rotted framing, upgrade the ceiling insulation to meet current energy code, and address the door opening’s weather sealing properly. By the end of this stage, the shell is watertight and framed out.

Stage 4: Rough-in and inspections (weeks 9 – 14)

Plumbing, electrical, and HVAC rough-in go in simultaneously, then the city inspects all three before drywall. This is the stage where homeowners make the calls that affect the finish: fixture selection, outlet placement, whether you want a 50-gallon water heater or a tankless unit, and where the mini-split head goes. Confirm these by week 10 or you’ll hold up your own job. Richardson’s inspectors are thorough on electrical, especially where older aluminum wiring runs into the conversion.

Stage 5: Finish-out and final inspection (weeks 14 – 20)

Drywall, texture, paint, flooring, cabinets, countertops, fixtures, trim, and final mechanical trim-out. We fire the systems up, test everything under load, and walk the city inspector through. Final inspection and certificate of occupancy follow. Then a walkthrough with you, where we go over the systems, hand off warranties, and confirm nothing on the punch list gets skipped. The 730-Day Done Right Promise covers our workmanship for two full years after that final walkthrough.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Shape Your Garage Conversion ADU

You’ll make a few dozen decisions over four months, but a handful matter more than the rest. Here’s what we walk Richardson homeowners through, with the honest trade-offs.

  • Door infill versus door retention: Most conversions infill the garage door opening with framed wall and matching siding or brick. Cheaper, better insulated, better looking. Keeping the door for a future car gives flexibility but costs more in insulation, weather sealing, and finish. In hail country, infill wins on resilience too.
  • Slab versus raised floor: A floated subfloor over the existing slab (typically $3 – $6 per square foot) gives you a level floor, warmer feet, and a place to run plumbing without trenching. Trenching the slab is cheaper upfront but disruptive and prone to future cracking where clay soil moves.
  • Mini-split versus ducted HVAC: A ductless mini-split handles a 400 – 600 square foot ADU well, runs $3,000 – $6,000 installed, and gives each unit its own thermostat. Ducted systems cost more and require running ductwork through a garage ceiling that may not have the clearance.
  • Bathroom finishes: A Kohler or Moen shower valve and trim set holds up for decades and parts are available locally. Cheap builder-grade fixtures look identical on day one and leak from the cartridge by year six. We usually spec Kohler or Moen here and refuse to deviate without a conversation.
  • Kitchenette countertops: Caesarstone quartz or Blanco sinks bring the ADU to the same standard as the main house, which matters if you’re renting it. Laminate is cheaper and fine for a home office conversion where no one’s cooking.
  • Windows: Impact-rated glazing is worth pricing on any conversion in this part of North Texas. More on that below.

What a Garage Conversion ADU Costs in Richardson, TX

A framer checking new wall framing on a home addition

The realistic Richardson range is $45,000 to $130,000, with most conversions landing between $55,000 and $85,000. The national “garage conversion” figure of $30,000 to $80,000 usually reflects a basic studio without a full bathroom or kitchenette, which rarely passes as a legal ADU here.

What moves your number:

  • Systems infrastructure ($8,000 – $25,000): A new subpanel, upgraded service if the panel is full, new water heater, HVAC, and a bathroom’s worth of plumbing. This is the single biggest variable and it’s set by the existing house, not your finish choices.
  • Bathroom and kitchenette scope ($6,000 – $22,000): A wet bar is one thing. A full bath with walk-in shower plus a cooking kitchenette is another.
  • Structural work ($3,000 – $15,000): Door infill, ceiling re-framing, foundation remediation if the slab is compromised, or hurricane straps where the garage wasn’t built to modern wind standards.
  • Finish grade ($5,000 – $25,000): Flooring, cabinetry, countertops, tile, paint. This is where you have the most control.
  • Permit and engineering fees ($2,000 – $6,000): Set by Richardson’s fee schedule plus any structural engineering needed.

A written estimate from us lists every line item, including the demo, framing, rough-in, finishes, and inspections, with fixed pricing. The number on the estimate is the number you pay. What’s typically not included: landscape repair beyond the immediate work area, personal property moving, and any remediation discovered behind walls that couldn’t be seen at the walkthrough. Your estimate will name those exclusions explicitly so there are no surprises mid-build.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Richardson Homes Specifically Do to This Job

Richardson’s post-war suburban core was largely built between the late 1950s and early 1980s, and the garages that came with those homes were built to the standards of that era, not this one. That means a garage conversion here is rarely a clean finish-out. In ZIPs 75080 and 75081, we regularly find original aluminum branch wiring feeding the garage, cast-iron drain stubs under the slab, and asbestos-era materials in older drywall and floor tile. None of that kills a project, but each adds a line to the scope and a permit check to the plan.

The other Richardson-specific factor is hail. The spring storm cycle here dents garage doors, pries at weather seals, and drives water into the wall cavity where a worn threshold meets the slab. A garage door that’s been through two or three hail seasons is often already leaking, and the day we infill that opening we’re also fixing years of trapped moisture, rotted sill plates, and damaged framing. We usually recommend impact-rated glazing on any new windows we add to the conversion, and we build the walls to modern wind bracing rather than matching the original bracing, which is often a single strap where the code now expects two.

Clay soil under the slab is the wildcard. The black gumbo under Richardson’s foundations swells and shrinks hard between wet and dry seasons, and an aging garage slab often shows the result: hairline cracks, settling at the corners, and a floor that’s out of level by an inch or more. We assess the slab during the estimate and, if it needs remediation, we price it separately so you can see exactly what that work costs. If the conversion is one part of a bigger modernization plan for a 1960s ranch, the wider scope belongs on our Home Additions & ADU in Richardson page, and we’re glad to talk through both together.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About Garage Conversion ADU in Richardson

A new stained cedar privacy fence

Schedule Your Free Garage Conversion ADU Estimate in Richardson

Call (844) 560-4467 to schedule a free on-site estimate. We’ll walk your garage, check the slab and electrical panel, and talk through what a legal Richardson garage conversion ADU would take for your specific home. You’ll get a written line-item estimate and a realistic timeline before anything is committed. We also serve nearby Plano, Addison, and Carrollton, so if you’re pairing this with a driveway resurface, take a look at our Concrete Driveways & Concrete Work in Richardson and Asphalt Driveways & Resurfacing in Richardson work.

Written by the team at Groundwork Construction Co.

Why Richardson Chooses Groundwork Construction Co. of Lewisville

We set the standard for garage conversion ADU in Richardson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richardson

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

Trusted by homeowners across Richardson and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelights

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Richardson?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Richardson.

(844) 560-4467

Request a Free Estimate in Richardson

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch