A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Plano, TX

New Detached ADU in Plano - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Plano: What It Takes, What It Costs

A new detached ADU in Plano is a fully separate, self-contained living structure built on your lot; it comes with its own foundation, utilities, entrance and address. Plan on 6 to 10 months from the first permit submittal to move-in day, depending on size and how fast the City of Plano turns around inspections. Most Plano projects land between $45,000 and $130,000. Call (844) 560-4467 to schedule a free on-site estimate and get a written, line-item scope before you commit to anything.

Call (844) 560-4467

How the Build Actually Moves, Stage by Stage

A second-story addition that matches the existing roofline

An ADU is a small house, and we build it like one. The sequence below is roughly how a Plano detached ADU runs from handshake to keys.

Stage 1 – Feasibility and site walk (week 1)

We walk your lot, measure setbacks, confirm where utilities enter the main house, and check whether your lot can legally hold a second dwelling under Plano rules. You decide on footprint and rough square footage here. This is where we flag the expensive surprises early instead of mid-build.

Stage 2 – Design, engineering and permits (weeks 2-8)

Working drawings get drawn and engineered, then submitted to the City of Plano. Because Plano runs one of the tighter permitting and property-maintenance regimes in Collin County, plan review alone can eat three to six weeks. You approve finishes and the layout in this window. HOA architectural review, if your subdivision has one, runs in parallel.

Stage 3 – Site prep and foundation (weeks 9-12)

Utility trenching, grading, and the slab or pier-and-beam foundation go in. On North Texas clay, foundation prep is where corners get cut and where we don’t. You’ll see the footprint staked and poured before any framing starts.

Stage 4 – Framing, envelope and rough-ins (weeks 12-20)

Framing, sheathing, roof, windows, and the electrical, plumbing and HVAC rough-ins happen here, followed by the rough-in inspections Plano requires. This is the longest single stretch and the one homeowners underestimate. You approve trim and drywall choices around week 16.

Stage 5 – Finishes, final inspection and punch list (weeks 20-32)

Cabinets, counters, flooring, fixtures, paint and landscaping go in. Final inspections pass, we walk the unit with you, and we fix anything on the punch list before you sign off. Every ADU we build is covered by our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make (and What Each One Costs You)

An ADU forces a stack of decisions. Here’s where the money actually shifts.

  • Slab vs. pier-and-beam foundation. A slab is cheaper and faster; pier-and-beam handles expansive clay better on sloped or older lots. On a Plano lot with known soil movement, this decision can swing the budget by thousands.
  • Footprint and square footage. A 600 sq ft unit and an 800 sq ft unit diverge fast on framing, roof, and finishing. Size is the single biggest lever on the final number.
  • Kitchen and bath grade. Rental-grade cabinets and counters keep you at the low end; KraftMaid cabinetry and stone counters push toward the high end. Who you’re building for (family, renter, aging parent) drives this.
  • Windows and doors. Impact-rated windows and exterior doors cost more up front but cut hail and wind damage in Plano’s storm belt. Andersen and Pella both make impact lines worth pricing.
  • Exterior finish. James Hardie fiber cement holds up to North Texas sun and hail better than vinyl, at a higher price. Brick or stone veneer to match the main house costs more still.

What New Detached ADU Construction Costs in Plano, TX

A framer checking new wall framing on a home addition

A new detached ADU in Plano runs $45,000 to $130,000 for the structure itself, with a realistic middle around $75,000 to $95,000 for a 600 to 800 sq ft unit. That range is honest, and it moves based on five things:

  • Size. Every square foot adds framing, roof, drywall and finishing.
  • Utility runs. The farther the ADU sits from your main panel and water/sewer tie-ins, the more trenching and trench-restoration you pay for.
  • Foundation condition. Clay soil, a sloped lot, or an existing structure to work around raises the cost.
  • Finish grade. Fixtures, cabinetry, flooring and appliances move the number by tens of thousands.
  • Permit scope and inspections. Plano’s review and inspection requirements add real time and cost to the build.

A written estimate from us lists line items: foundation, framing, electrical, plumbing, HVAC, finishes, permits. What’s typically not included is landscaping beyond the immediate build, separate utility connection fees, and site survey work. Ask for those up front so nothing surprises you. No-hassle upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Plano Lots and Codes Shape This Build

Plano is a mature, largely built-out first-ring Dallas suburb, and most of the work here is remodel, addition and rebuild rather than new tract construction. That matters for an ADU: you’re threading a new structure onto a lot that was never planned for one. In Plano’s central and east corridors, around 75023 and 75075, housing dates to the 1970s and 1980s, and utility panels and sewer laterals often need upgrading before they can carry a second dwelling. Out in the west-side ZIPs like 75024 and 75093, newer lots and HOA architectural review add a layer of design approval that must clear before the City of Plano permit office signs off.

The climate drives the build, too. Expansive clay soil and the region’s hail belt mean the foundation and roof are not afterthoughts; they’re the first things we get right. If you’re in Plano and your project involves broader scope, this often fits as part of a full Home Additions & ADU in Plano plan.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Plano

A walk-in shower with large-format tile and a built-in niche

Schedule a Free ADU Estimate in Plano

A new detached ADU in Plano is a real investment, and you deserve a clear scope and a firm number before ground breaks. Call (844) 560-4467 for a free on-site estimate. A live person answers around the clock, and we’ll walk your lot, lay out the range for your size and grade, and show you how the permit timeline runs. Learn more about our Home Additions & ADU service, see the other Plano work we do in Plano, and if your site plan needs a new approach, homeowners often pair this with Concrete Driveways & Concrete Work in Plano or Paver Driveways in Plano.

Written by the team at Groundwork Construction Co.

Why Plano Chooses Groundwork Construction Co. of Lewisville

We set the standard for new detached ADU in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in Plano

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Plano?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Plano.

(844) 560-4467

Request a Free Estimate in Plano

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch