A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · The Colony, TX

ADU Site Prep & Utilities in The Colony - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in The Colony: What It Takes and What It Costs

ADU site prep and utilities in The Colony runs $45,000 – $130,000 for the site work, utility trenching, and connection portion of a backyard unit, and typically takes 6 – 10 weeks before the first wall goes up. That covers grading, the foundation pad, running electric, water, sewer, and gas from the main house or the street, and passing The Colony’s inspections at each stage. Call (844) 560-4467 to schedule a free on-site estimate.

Call (844) 560-4467

How the Work Actually Sequences, Week by Week

A finished backyard cottage with a small covered porch

This is the part most homeowners underestimate. Site prep and utilities aren’t a two-day errand before the “real” build; they’re the stage that decides whether the rest of the project runs on schedule or stalls at inspection. Here’s how we run it.

Stage 1: Site assessment and utility locate (days 1 – 2)

We walk the yard, pull the plat and any prior permits on file, and call in the utility locate before a shovel touches the ground. You’ll decide the exact ADU footprint and setback at this stage, because where the pad sits determines how far every utility run has to travel. Deep lots with the unit set back 60 feet cost more to trench than a pad tucked closer to the house.

Stage 2: Grading, excavation, and drainage (days 3 – 6)

We strip topsoil, cut and fill to the pad elevation, and establish the slope that sends water away from both the ADU and the existing house. The Colony’s expansive clay makes this step matter: a pad graded flat will heave and settle within a season. You’ll sign off on the pad elevation and the drainage swale route here.

Stage 3: Utility trenching and rough-in (days 6 – 12)

Electric, water, sewer, and gas each get their own trench run and their own inspection window. Sewer needs fall to the connection point, so the trench depth and slope get set at this point, not adjusted later. This is the stage where surprises cost real money: a root-bound line, a shallow main, or a sewer clean-out that isn’t where the plat says it is. Homes built in The Colony’s 1970s – 90s subdivisions frequently have utility runs that have shifted or settled over four decades.

Stage 4: Foundation pad and conduit (days 12 – 18)

Once trenching is inspected, we pour the pad and set conduit and stub-outs for the future structure. You’ll choose pad type (slab-on-grade, pier-and-beam, or a conditioned crawlspace) and confirm utility stub locations relative to the ADU wall lines. Get this wrong and every later trade fights the building.

Stage 5: Inspection, backfill, and handoff to the build (days 18 – 25)

The city inspects the rough utilities, we backfill and compact the trenches, restore the lawn, and hand off to the construction phase. You’ll receive the inspection sign-offs and a utility as-built drawing that maps every run, which protects you years down the road if you ever add a pool, fence, or second unit.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Spec Choices That Move the Number

Before any dirt moves, you’re picking between options that determine both cost and how the ADU behaves for the next 40 years. Here’s where the honest trade-offs live.

  • Trench length and utility source. Tapping off the main house is usually cheaper than a fresh lateral to the street, but only if your main has capacity. On older lots, a new lateral from the city main can add $8,000 – $20,000. Short runs off the house keep costs down; long lake-lot runs don’t.
  • Electrical service. A dedicated 100-amp or 200-amp sub-panel from the house is the standard choice. If the main panel is maxed out, a service upgrade is a separate cost and a separate permit. Plan for 200-amp capacity if the ADU will have an EV charger or heat pump.
  • Sewer vs. septic. Most The Colony lots connect to city sewer; a handful of older lakefront properties have septic systems that will need to be evaluated for added load. Connecting to municipal sewer is the cleaner option; replacing a failing septic system before adding an ADU can run $15,000 – $40,000.
  • Pad type. Slab-on-grade is the most cost-effective and the most common in this area. Pier-and-beam opens up a few more dollars in cost but makes future utility access easier. On the expansive clay around Lewisville Lake, we always run a moisture barrier under the slab.
  • Grading and drainage. A lot with good existing slope is straightforward. A flat or negatively sloped yard needs a French drain, swale, or dry well – a $3,000 – $8,000 line item that catches homeowners off guard.

Materials and systems have quality tiers that are worth discussing with the estimator before signing. We work with brands like CertainTeed and Owens Corning on the structural and envelope side of the eventual ADU build. Where storm-loaded envelope matters, those brand choices carry into the roof and wall assembly the site work supports.

What ADU Site Prep & Utilities Costs in The Colony, TX

A framer checking new wall framing on a home addition

Site prep and utilities for a The Colony ADU run $45,000 – $130,000. That’s the site-and-utilities portion of the total ADU project, not the whole build. A simple pad with short utility runs off an existing main sits near the low end; a long-lot build with a service upgrade, drainage work, and a new lateral lands at the top.

What pushes a job low to high:

  • Run length. Tapping the house 20 feet away vs. running 100 feet to the street corner can swing the number by $10,000 – $25,000.
  • Utility capacity. A main panel with spare capacity is cheap; a service upgrade is not. Same story for water pressure and sewer elevation.
  • Grade and drainage. Flat or sloped-toward-the-house lots need engineered drainage. That’s $3,000 – $8,000 typically.
  • Soil conditions. Expansive clay, rock at depth, or high groundwater all change pad construction and trench cost.
  • Permit scope. Separate utility, grading, and building permits add inspection cycles and fees. A combined permit under one scope usually saves time.

Your written estimate will itemize grading, trenching, pad, utility connections, permit fees, and inspection costs line by line. It won’t include the ADU structure itself – that’s the build phase, and it’s quoted separately. Call (844) 560-4467 for an exact quote; estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What The Colony Homes Specifically Do to This Job

The Colony is a built-out, landlocked city on the south shore of Lewisville Lake, and almost no ground here breaks new. That changes the ADU equation: you’re not building on virgin soil, you’re building behind a house that’s already 40-plus years old, with utilities, fences, and mature trees in the way. In the 75056 ZIP and especially in the older lake-adjacent subdivisions, homes built in the 1970s and 1980s are hitting the point where original water and sewer laterals have lived their service life. Before we trench an ADU, we often find a main line that’s settled or root-damaged, and that becomes part of the project scope. North Texas clay movement makes trench walls and pad prep a different experience here than on sandier ground, and the spring hail and high-wind pattern means any above-grade work we prep for the ADU has to account for wind load. When the ADU needs a driveway apron or a fresh sidewalk pour after utility work, homeowners often pair this with Concrete Driveways & Concrete Work in The Colony, and a paver approach is another common choice for Paver Driveways in The Colony.

This site work is one phase of a larger project – if you haven’t locked in the build scope yet, our overview of Home Additions & ADU in The Colony lays out the full picture. And our Home Additions & ADU service covers every phase from the pad we prep to the final inspection.

Serving The Colony, TX – Our Local Coverage Area

We serve The Colony and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in The Colony

A new front yard fence with a matching gate

Get Your Free Site Prep and Utilities Estimate in The Colony

If you’re planning an ADU in The Colony and need to know what the site work and utilities will cost before you commit, call (844) 560-4467. We’ll schedule a free on-site estimate, walk your lot, and hand you a written itemized quote. Live person answers the phone, 24/7. Upfront pricing, no surprises, and a real answer on whether your lot can support the unit.

Written by the team at Groundwork Construction Co.

Why The Colony Chooses Groundwork Construction Co. of Lewisville

We set the standard for ADU site prep & utilities in The Colony.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in The Colony

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What The Colony Customers Say

Trusted by homeowners across The Colony and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
An open kitchen and dining area after a remodelA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver border

More services in The Colony

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in The Colony?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in The Colony.

(844) 560-4467

Request a Free Estimate in The Colony

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch