A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Addison, TX

ADU Site Prep & Utilities in Addison - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Addison, TX: What It Costs and How Long It Takes

ADU site prep and utilities in Addison typically runs $45,000 – $130,000 for the sitework, grading, foundation, and utility tie-ins of a detached or attached accessory dwelling, not counting design or the structure itself. Most projects here take 4 to 8 weeks from first dig to final inspection sign-off. Call (844) 560-4467 for a free on-site estimate, and we’ll walk the pad location, the utility route, and the soil before we put a number on paper.

Call (844) 560-4467

How We Run ADU Site Prep & Utilities, Start to Finish

A remodeled family room with new windows and a window seat

This isn’t a job where “we handle everything” tells you anything. Here’s what actually happens, day by day, so you know what to expect and what decisions land on you.

Stage 1: Site walk and utility locate (day 1)

We mark the build envelope, call 811 for underground locates, and pull the plat map to see where your existing water, sewer, gas, and electrical actually run. You decide the ADU footprint orientation and where the front door faces. Most locate tickets clear in 2 to 3 business days, so we schedule the survey around that window.

Stage 2: Demolition and grading (days 3 – 7)

Old patios, fences, and landscaping come out, then we cut and fill the pad to grade. In North Texas clay, that means over-excavating 6 to 12 inches and recompacting in lifts, because native expansive soil moves with the seasons. You decide whether the finished pad sits flush with the yard or raised on a small stem wall.

Stage 3: Utility trenching (days 6 – 12)

We trench for the sewer lateral, water line, gas, and electrical conduit to the ADU. Sewer needs a minimum slope and your tie-in may require a backwater valve. Electrical conduit size depends on whether you’re running 60-amp or 100-amp service to the unit. You decide the service size now; changing it later means re-trenching.

Stage 4: Foundation form and pour (days 10 – 18)

Forms go up, rebar is set to plan, and a pre-pour inspection happens before any concrete lands. Post-tension slab or conventional rebar are both common for Addison ADUs. You decide slab versus pier-and-beam; slab is cheaper and faster, pier-and-beam handles poor drainage better on tight lots.

Stage 5: Rough-in stub-outs and backfill (days 16 – 24)

Utility stub-outs get capped at the ADU foundation, trenches get backfilled and compacted, and the inspection sequence closes out site prep. After this, framing starts and the sitework phase is done. Total for this phase: 4 to 8 weeks, weather dependent.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Site and Utility Choices You’ll Actually Make

These are the real forks in the road for ADU site prep and utilities in Addison, with honest trade-offs on each.

  • Slab versus pier-and-beam foundation. A slab runs $18,000 – $40,000 for a typical ADU pad and works fine on well-drained lots. Pier-and-beam adds $8,000 – $15,000 but handles Addison’s clay movement and tight drainage better, and it makes future plumbing access easier.
  • Electrical service size. 60-amp runs are common for a studio or one-bedroom ADU and cost less to trench and wire. 100-amp gives you room for mini-split HVAC, an electric range, and a dryer. If you might add equipment, run the bigger conduit now; the cost to upsize later is severe.
  • Utility route: shared versus separate meters. Tying the ADU into the main house meter keeps the utility company out of the paperwork but limits how you bill a tenant. A separate meter adds $3,000 – $8,000 in trench, meter can, and utility fees, but simplifies rental arrangements.
  • Sewer tie-in point. Gravity flow to the main line where grade allows; a lift pump adds $4,000 – $9,000 and introduces a moving part that fails. On Addison’s tighter lots, grade sometimes forces the lift pump decision.
  • Water and gas line material. PEX for water is flexible and forgiving of clay movement; copper costs more but lasts longer in some soil conditions. Gas lines in Addison are typically yellow-jacketed polyethylene for buried runs. Choose based on soil, not budget alone.

What ADU Site Prep & Utilities Costs in Addison, TX

A framer checking new wall framing on a home addition

The full lead range is $45,000 – $130,000 for site prep and utility tie-ins on a project in this market. That spread is wide because the variables below swing it hard. A straightforward slab, gravity sewer, and shared meter on a flat lot lands near the bottom. A pier-and-beam build with a lift pump, separate meters, and a long trench run toward a back-corner pad pushes toward the top.

What moves the number

  • Pad size and ADU footprint. A 500-square-foot pad and a 900-square-foot pad are materially different earthwork and concrete jobs.
  • Existing site condition. Tearing out a paver patio, mature trees, or an old concrete slab adds demo cost. Flat lots with good drainage stay cheap; lots with grade problems cost more.
  • Utility distance and obstacles. Every foot of trench and every crossing under a driveway or sidewalk adds cost. Crossing an existing concrete driveway means saw-cutting and patching.
  • Utility relocations. If the ADU footprint conflicts with the sewer main or an electrical line, that relocation is real money.
  • Permit and inspection scope. A separate ADU permit, planning review, and utility company coordination add cost and time.

What a written estimate includes: earthwork, grading, foundation form and pour, trenching, utility stub-outs to the pad, backfill and compaction, and permit fees we pull on your behalf. What it typically doesn’t include unless we itemize it: the structure itself, the sewer lift pump if one is needed, utility company tap fees, and landscaping restoration. Upfront pricing means the number you see is the number you pay, and your written estimate breaks out every line so you can see what’s in and what’s out. Our technicians have up to 12 years of experience on sitework like this, and all work is covered by our 730-Day Done Right Promise.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Addison’s Built-Out Character Means for ADU Sitework

Addison is a 4.4-square-mile city that’s essentially full, and the density is commercial. That shapes ADU work here in ways you won’t see in Carrollton or Farmers Branch. The city’s housing stock is thin on traditional single-family lots and heavy on 1970s – 90s commercial buildings, hotels, restaurants, and multifamily. When a property here does have room for an ADU, it’s often a tight infill lot hemmed in by commercial property, which means utility locates pull up dozens of old commercial lines, and trenching goes around existing parking and landscaping rather than through open lawn. Soil is a factor on nearly every job in the 75001 ZIP – North Texas clay expands and contracts with the seasonal rain, and spring hail and high winds mean foundation edges and utility stub-outs need to be finished to withstand weather. If part of an ADU project grows into other exterior work, homeowners often pair this with Concrete Driveways & Concrete Work in Addison or a new hardscape to finish the yard. When the scope widens to the full build, that’s our Home Additions & ADU service; the broader project lives on our Home Additions & ADU in Addison page. We cover the whole city through our Addison service area, and finish work like Paver Driveways in Addison is a natural add-on once the site is done.

Serving Addison, TX – Our Local Coverage Area

We serve Addison and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in Addison

A remodeled kitchen with a waterfall island and wood cabinets

Get a Free ADU Site Prep & Utilities Estimate in Addison

Call (844) 560-4467 for a free on-site estimate on ADU site prep and utilities in Addison. On the call, we’ll schedule a property visit, mark the proposed pad, check utility locates, and follow up with a written line-item estimate that spells out what’s included and what’s optional. No pressure, no vague “starting at” pricing. The estimate is free, and the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why Addison Chooses Groundwork Construction Co. of Lewisville

We set the standard for ADU site prep & utilities in Addison.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Addison

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Addison Customers Say

Trusted by homeowners across Addison and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelights

More services in Addison

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Addison?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Addison.

(844) 560-4467

Request a Free Estimate in Addison

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch