Cabinets & Countertops in Irving, TX: What the Job Actually Involves
New cabinets and countertops in Irving typically run $14,000 – $45,000 for a full kitchen’s worth, and most of that job is done in 2 – 4 weeks of working days once materials land. The core question is usually scope: are you replacing boxes in the same footprint, or moving the sink, range, and island? Same-footprint work is faster and far cheaper. Call (844) 560-4467 for a free on-site estimate and a written line-item quote before you commit to anything.
How We Run a Cabinet and Countertop Job, Start to Finish

This isn’t a “we handle everything” hand-wave. Here’s the actual sequence, in order, with the decision points where you’re the one choosing.
Stage 1: Measure, layout, and the order (days 1 – 3)
We template the existing kitchen to the sixteenth of an inch and confirm what’s staying and what’s moving. You decide box construction (plywood vs. particleboard, framed vs. frameless), door style, and finish at this stage, because lead times drive the whole schedule. Cabinet orders run 3 – 8 weeks depending on the line, so this is the longest wait of the project and the one most people underestimate.
Stage 2: Demo and tear-out (1 – 2 days)
Old cabinets, countertops, and backsplash come out, and we inspect what’s underneath. In older Irving homes this is where surprises live: water damage at the sink base, out-of-square walls, or a slab that’s moved. We photograph everything and flag any change in scope before touching it, in writing, so there’s no surprise line on the final invoice.
Stage 3: Rough-in and prep (1 – 3 days)
If the sink, dishwasher, or range is relocating, this is when the plumber and electrician rough in the new locations and the inspection happens. New drywall patches get floated and primed. You decide appliance locations and outlet placements here, and once the drywall closes up, those decisions are locked.
Stage 4: Cabinet install (2 – 4 days)
Base cabinets get set and leveled, then uppers, then the island if there is one. Crown, light rail, and filler panels go on. Doors and drawers get adjusted after the boxes are true. You walk the kitchen with us at the end of this stage to confirm alignment and hardware placement.
Stage 5: Template, fabricate, and set the countertops (7 – 14 days total)
Stone counters get templated after the cabinets are in, then fabricated and set. That gap is the one people don’t plan for: the kitchen sits unusable for a week to ten days while the slab is cut. Sink and faucet go in at final set, and the job is walkthrough-ready after that.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and the Honest Trade-Off of Each
- Cabinet boxes – plywood vs. particleboard: Plywood holds up to moisture and re-screwing better over 20+ years; particleboard is cheaper by roughly 15 – 25% and fine in a dry kitchen. In Irving’s humid summers, plywood earns its keep in sink bases especially.
- Framed vs. frameless cabinets: Frameless gives you more usable interior space and a cleaner modern look; framed is more forgiving on out-of-square walls, which matters in older slab homes. KraftMaid covers both, so you’re not locked in.
- Countertop material: Quartz is the default for durability and low maintenance; Cambria’s quartz lines hold pattern well. Granite is naturally unique and heat-tolerant but needs sealing. Butcher block is warm and repairable but wants care around the sink. Laminate is the budget play ($2,000 – $6,500 installed) but shows wear fastest.
- Edge profile and thickness: A standard eased edge costs nothing extra; a mitred 2.5-inch edge adds real money but changes the whole look.
- Hardware and soft-close: Soft-close drawers and doors are worth the small upcharge; you’ll feel the difference every day.
What Cabinets & Countertops Cost in Irving, TX

A full kitchen’s worth of new cabinets and countertops lands between $14,000 and $45,000 in Irving. Here’s how the line items break down and what pushes a job toward either end.
| Line item | Range in Irving |
|---|---|
| Cabinet installation (full kitchen) | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island (if included) | $3,000 – $10,000 |
| Backsplash (if included) | $800 – $2,500 |
What moves the price: size and cabinet count, cabinet grade and door style, countertop material and edge, whether plumbing or electrical relocates, and permit scope. A same-footprint swap with stock cabinets and laminate can land near the low end; a full custom layout with quartz islands and relocated plumbing pushes the high end fast. Every written estimate is line-itemed and fixed – the number you see is the number you pay – and if work isn’t done right, the 730-Day Done Right Promise covers it.
See the difference
Before
After
Before
After
Before
AfterWhat Irving Homes Do to This Job
Irving has two very different construction realities packed into one city. The older core along the 183 corridor – ZIPs like 75060 and 75061 – is full of post-war 1950s – 60s brick-veneer slab homes where kitchens are small, walls are often out of square, and the slab has moved some from Irving’s expansive black-clay soil. We routinely find sink-base cabinet rot and cracked countertop seams in these homes, and expanding a doorway to open a kitchen often reveals framing that needs correction. The Las Colinas and Valley Ranch side, ZIPs like 75038 and 75039, is planned-community housing with HOA design review, so cabinet finishes and even visible hoods can be subject to approval. Permits and inspections follow City of Irving rules, and DFW summer heat means we schedule installs early in the day. Homeowners often pair this with a bigger scope – our Kitchen Remodeling in Irving covers the full project, and some add a Garage Conversion ADU in Irving while walls are open.
Serving Irving, TX – Our Local Coverage Area
We serve Irving and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Irving

A same-footprint swap runs about 2 weeks of working days once materials arrive; a layout change with new plumbing and electrical runs 4 – 6 weeks. Cabinet lead times (3 – 8 weeks) are usually the real bottleneck, not the install. Call (844) 560-4467 to lock a schedule and get an exact quote on your Irving kitchen.
A straight same-footprint replacement usually doesn’t require a permit; relocating plumbing, electrical, or walls does. We pull the required permits with the City of Irving and coordinate inspections so nothing stalls the job. Call (844) 560-4467 and we’ll confirm the permit scope for your project during the free estimate.
Yes, and it’s the most common way to control cost. Keeping the sink, range, and dishwasher in place avoids rough-in work, electrical relocations, and extra inspection time, which is a large slice of the budget. Call (844) 560-4467 to talk through whether your layout can stay put.
Expect $14,000 – $45,000 for a full kitchen, with cabinet install at $4,000 – $13,000 and countertops at $2,000 – $6,500. Size, material grade, and whether plumbing or electrical relocates determine where you land in that range. Call (844) 560-4467 for an exact quote – estimates are free.
Every cabinets and countertops project is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right, and it’s one of the longest workmanship guarantees in residential construction. Product warranties from brands like KraftMaid and Cambria ride alongside it. Call (844) 560-4467 for details on your specific job.
Get a Free Estimate for Cabinets & Countertops in Irving
We’ll come to your Irving kitchen, measure, talk through layout and materials, and hand you a written line-item estimate with a fixed price – no change orders after the fact. If this is part of a bigger plan, our Kitchen Remodeling service covers the whole scope, and we serve every corner of Irving, from 75061 to Las Colinas. Call (844) 560-4467 to schedule – a live person answers 24/7. A related addition such as a New Detached ADU in Irving can be priced on the same visit. Financing is 0% for 18 months, plus $1,000 off projects over $10,000.
Written by the team at Groundwork Construction Co.