A Groundwork company - serving Lewisville, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · The Colony, TX

ADU Design & Permitting in The Colony - Design, Permits and Build Under One Contract

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Lewisville
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in The Colony, TX: What It Takes and What It Costs

ADU Design & Permitting in The Colony, TX typically runs $45,000 to $130,000 for the full design-and-build path, with design, engineering, and city plan review taking 6 to 12 weeks before a shovel hits the ground. The Colony is a built-out lake city with almost no new lots, so nearly every ADU here is a garage conversion, interior conversion, or tight-lot detached unit that has to clear zoning, setbacks, and impervious-cover rules. Call (844) 560-4467 and we’ll walk your lot and your goals before you spend a dime on drawings.

Call (844) 560-4467

How the design-and-permit path actually runs, start to finish

Detached ADUs on oversized lots get most of the attention, but in The Colony the paperwork is where projects stall, not the framing. Here’s the sequence we follow, with the real timing.

  • Stage 1 – Site visit and feasibility (days 1-3). We measure the lot, check existing setbacks against your fence line, confirm available impervious cover, and photograph the garage or interior space you’re converting. You decide at this stage whether you’re pursuing a detached unit, a garage conversion, or an interior conversion – the answer drives everything downstream.
  • Stage 2 – Schematic design and budget check (weeks 1-3). We produce a floor plan and elevation at concept level, plus a line-item budget against the $45,000-$130,000 band for your scope. You approve the footprint, ceiling height, and whether you want a full kitchen and bath or a kitchenette and bath. This is the cheapest place to change your mind.
  • Stage 3 – Construction drawings and engineering (weeks 3-6). Architectural sheets, structural calcs for the foundation and any new roof framing, MEP layouts, and energy code compliance. You decide on the systems here – tankless versus tank water heater, mini-split versus ducted HVAC, and whether the panel has capacity for a full second dwelling. On slab-on-grade with North Texas clay, we spec the foundation design now, not later.
  • Stage 4 – City submittal and plan review (weeks 6-12). We submit to The Colony’s building department, respond to plan-review comments, and clear zoning review for setbacks, height, and parking. You sign off on any change the reviewer requires. Most residential ADU reviews in a mature, built-out city like The Colony draw at least one round of comments, so we build slack into the schedule.
  • Stage 5 – Permit issuance and pre-construction (weeks 12-14). Permit in hand, we pull the trade permits (electrical, plumbing, mechanical), lock the material selections, and schedule the build. You pick finishes and confirm the move-in timeline here. Permits get pulled and inspections passed on every job, and the build carries our 730-Day Done Right Promise.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The design and spec choices you’ll actually decide on

An ADU is a house in miniature, and the choices that move cost the most are also the ones that determine how well it holds up in a hot, hail-prone climate.

  • Attached vs. detached vs. interior conversion. A garage conversion is the lowest-cost route because the shell, slab, and roof are already there and you’re mostly working inside. A detached unit gives you privacy and rental separation but adds a full foundation, roof, and utility trench. Interior conversion inside the main envelope is the fastest to permit but limited by existing footprint.
  • Roofing material. Standard architectural shingles from CertainTeed or Owens Corning are the value play and handle North Texas hail well when paired with impact-rated underlayment. Standing-seam metal costs more up front but shrugs off hail and lasts decades – a real consideration given the storm cycle here.
  • Foundation and slab. On our expansive clay, a properly engineered post-tension or pier-and-beam design matters more than the finish above it. Skipping engineering to save a few thousand dollars is the most expensive mistake we see.
  • HVAC and water heating. A ductless mini-split is cheaper to install and right-sized for a compact ADU; a ducted system is quieter and better if the unit is large. Tankless water heating saves floor space in a small unit.
  • Kitchen and bath grade. A builder-grade package keeps you near the low end; a full kitchen with quality cabinetry and solid-surface counters pushes toward the high end.

What ADU Design & Permitting costs in The Colony, TX

A garage converted into a guest room and home office

Plan on $45,000 to $130,000 for the design, engineering, permitting, and construction of an ADU in The Colony, with the design-and-permit phase alone usually $4,000 to $12,000 of that total. The number climbs with size, site complexity, existing condition, and the grade of finishes.

Line item Typical range
Design, engineering & drawings $3,000 – $9,000
Permit, plan review & inspections $1,000 – $3,500
Full ADU build (design + permit + construction) $45,000 – $130,000
Garage conversion scope $30,000 – $80,000

Four variables push a job to the low or high end. Size and configuration – a 400 sq ft studio and an 800 sq ft one-bedroom live in very different bands. Site and utility work – a detached unit needing a new trench, panel upgrade, and water/sewer tap adds real money. Existing condition – a 1980s garage in an aging lake subdivision may need foundation attention before you frame. Finish grade – cabinets, counters, fixtures, and flooring swing thousands. A written line-item estimate tells you exactly what’s included and what isn’t (landscape repair, utility trenching, and appliance packages are the usual exclusions), and the price you see is the price you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What The Colony homes and the lake-city geography do to this job

The Colony is landlocked and built out on the south shore of Lewisville Lake, so almost no one here breaks new ground – which means the ADU conversation is really a redevelopment conversation. The core subdivisions went up from the 1970s through the 1990s, so garages and unused interior rooms are now 40-plus years old and hitting the same wall at once. That age changes the job: a garage conversion in one of the older lake-adjacent subdivisions often starts with a foundation and drainage assessment before we can frame, because clay movement has done its work. North Texas heat drives HVAC sizing and insulation calls, and the spring hail cycle means roof and envelope specs on a detached unit need to survive a bad season. The city’s plan review for a built-out, landlocked community is where setbacks, impervious cover, and parking get scrutinized, so drawings that don’t anticipate those comments sit in review. That’s where a licensed local pro pulling permits correctly saves you weeks – and where our home additions & adu service coordinates design, permit, and build under one estimate, part of a full Home Additions & ADU in The Colony scope when the ADU is one piece of a larger plan. When the project includes a new approach or outdoor living, homeowners often pair this with Paver Driveways in The Colony and a Chain Link Fence in The Colony to fence and finish the new unit’s yard. We cover every part of The Colony, so the same crew that draws your plans handles the build.

Serving The Colony, TX – Our Local Coverage Area

We serve The Colony and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Design & Permitting in The Colony

A framer checking new wall framing on a home addition

Start with a free on-site estimate

Before you commission drawings, let us walk your lot in The Colony and give you a realistic number. Call (844) 560-4467 and a live person picks up around the clock. On the visit we’ll check setbacks, impervious cover, and existing condition, then hand you a written line-item estimate for the design, permit, and build – free, with no pressure and 0% financing available.

Written by the team at Groundwork Construction Co.

Why The Colony Chooses Groundwork Construction Co. of Lewisville

We set the standard for ADU design & permitting in The Colony.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in The Colony

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What The Colony Customers Say

Trusted by homeowners across The Colony and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roof

More services in The Colony

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Lewisville

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Lewisville team

A local vetted partner works across Lewisville and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in The Colony?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in The Colony.

(844) 560-4467

Request a Free Estimate in The Colony

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch